Bldg. E23- 023, blood lab, phlebotomy lab Normal and Emergency Power Shutdown (panels PS2311 and ESH23B1)
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu Jun 20 14:27:17 2013
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <biss@MIT.EDU>
Date: Thu, 20 Jun 2013 14:27:14 -0400
Message-ID: <8A2D788F2E0345D897B65DE1B2BF6D1A@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following Normal and Emergency Power Shutdown is for bldg. E23 - 023, blood lab, phlebotomy lab on Tuesday, June 25, 2013 from 12:01am til 6:00am is for your information and approval. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: June 25, 2013
Day: Tuesday
Time: 12:01am til 6:00am
Building(s): E23
Room(s): 023, blood lab, phlebotomy lab
System: emergency power and building power
Duration: 12:01am til 6:00am
Reason:
We request bldg E23 480V/277V/208V/120V emergency power panel ESH23B1 (includes blood lab 208V panel ESL23111) and 208V panel PS2311 (Phlebotomy lab) normal bldg power shutdowns from 12:01 AM midnight to 6 AM on Tuesday morning, June 25th, 2013 for Crocker Electric to tie-in a lab waste transfer pump in the bsmt E25-001 mech room at 480V EP ESH23B1 in E23 HV Room and to install circuit breakers and tie-in electric reheat for Urgent Care at panel PS2311 as part of an add to the Pharmacy Storefront project by Elaine Construction (Bernie Cincotta 617-590-3944). Kim Sutherland 8-5972 and Biss Teelucksingh 2-5972 are the MIT project managers.
Affected equipment other than the 1st floor labs noted above are copiers/printers in E23-023 suite and a bsmt ejector pump. A bsmt fan coil unit is also noted.
Effect:
Loss of building power and emergency power for the duration of this shutdown.