[170148] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Approved - Bldg. E23- Air Handlers #8,9, 10 (shutdown by Operations

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Thu Jun 13 13:14:45 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: OPS RM Campus Services East <rm-ecs@mit.edu>,
        "Ops Custodial Admin &
 Support Staff" <cust-staff@mit.edu>,
        "bengel@mit.edu" <bengel@mit.edu>, "tquinn@mit.edu" <tquinn@mit.edu>,
        "brig@med.mit.edu" <brig@med.mit.edu>,
        "fris@med.mit.edu" <fris@med.mit.edu>,
        "heatherg@mit.edu" <heatherg@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        Warren Scott
	<WScott@plant.mit.edu>,
        Ops RM Shutdown <rm-shutdown@mit.edu>, DOF EHS
	<dof-ehs@mit.edu>,
        "cp-command@mit.edu" <cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
        "DOF
 Customer Service Center" <dof-csc@mit.edu>,
        "Ops Custodial Admin & Support
 Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "biss@mit.edu" <biss@mit.edu>
Date: Thu, 13 Jun 2013 13:14:39 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C3A83822@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C3A83822dofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13C3A83822dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following Approved Air Handler #8,9,10 shutdown is for bldg. E23 - All =
on Thursday, June 13, 2013 from 11:00pm til 6:00am Friday, June 14, 2013 is=
 for your information.  Any questions please contact Billy Homeyer x8-0432.


Thank you,


Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: June 13, 2013
Day: Thursday
Time: 11:00pm (Thu) - 6:00am (Fri)  11:00pm (Mon) - 6:00am(Tue) - 11:00pm (=
Tue) - 6:00am (Wed)
Building(s): E23
Room(s): all
System: air handlers 8, 9, 10
Duration: 11:00pm (Thu) - 6:00am (Fri), 11:00pm (Mon) - 6:00am(Tue) - 11:00=
pm (Tue) - 6:00am (Wed)
Reason:
The shutdown has been pre-cleared by bldg E23 - BB The shutdown of only one=
 of the fans is actually necessary. When the fan # is determined tonight 6/=
13, the shutdown of two fans will be cancelled. Elaine Construction to call=
 OPS Center 3-1500 - Nicole - at around 11 PM.

We request bldg E23-AH8, AH9, AH10 shutdowns (remotely by the OPS Center) f=
rom 11PM on Thursday, Monday and Tuesday evenings June 13th, 17th and 18th =
at 11 PM until 6 AM on Friday, Tuesday and Wednesday mornings June 14th, 18=
th and 19th, 2013 respectively for installing new and reconfiguring some ex=
isting, AH8, 9 or 10 ductwork associated with the Urgent Care area work add=
ed to the E23 Pharmacy Storefront project by Elaine Construction (Bernie Ci=
ncotta 617-590-3944). Biss Teelucksingh 2-5972 and Kim Sutherland 8-5962 ar=
e the MIT project managers.

Effect:
Loss of air handlers 8, 9, 10 for the duration of this shutdown.



--_000_4EEA516695C10541B7CB963FF54A56AF13C3A83822dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
 #800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following Approved Air Handler #8,9,10 shutdown is for bldg. E23 -=
 All on Thursday, June 13, 2013 from 11:00pm til 6:00am Friday, June 14, 20=
13 is for your information.&nbsp; Any questions please contact Billy Homeye=
r x8-0432.</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Thank you,</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div>&nbsp;</div>
<div>Type: Normal</div>
<div>Date: June 13, 2013</div>
<div>Day: Thursday</div>
<div>Time: 11:00pm (Thu) - 6:00am (Fri)&nbsp; 11:00pm (Mon) - 6:00am(Tue) -=
 11:00pm (Tue) - 6:00am (Wed)</div>
<div>Building(s): E23</div>
<div>Room(s): all</div>
<div>System: air handlers 8, 9, 10</div>
<div>Duration: 11:00pm (Thu) - 6:00am (Fri), 11:00pm (Mon) - 6:00am(Tue) - =
11:00pm (Tue) - 6:00am (Wed)</div>
<div>Reason: </div>
<div>The shutdown has been pre-cleared by bldg E23 - BB <b>The shutdown of =
only one of the fans is actually necessary. When the fan # is determined to=
night 6/13, the shutdown of two fans will be cancelled. Elaine Construction=
 to call OPS Center 3-1500 - Nicole
- at around 11 PM.</b></div>
<div>&nbsp;</div>
<div>We request bldg E23-AH8, AH9, AH10 shutdowns (remotely by the OPS Cent=
er) from 11PM on Thursday, Monday and Tuesday evenings June 13th, 17th and =
18th at 11 PM until 6 AM on Friday, Tuesday and Wednesday mornings June 14t=
h, 18th and 19th, 2013 respectively
for installing new and reconfiguring some existing, AH8, 9 or 10 ductwork a=
ssociated with the Urgent Care area work added to the E23 Pharmacy Storefro=
nt project by Elaine Construction (Bernie Cincotta 617-590-3944). Biss Teel=
ucksingh 2-5972 and Kim Sutherland
8-5962 are the MIT project managers.</div>
<div>&nbsp;</div>
<div>Effect: </div>
<div>Loss of air handlers 8, 9, 10 for the duration of this shutdown. </div=
>
<div>&nbsp;</div>
<div>&nbsp;</div>
</font>
</body>
</html>

--_000_4EEA516695C10541B7CB963FF54A56AF13C3A83822dofexchmbx01f_--

home help back first fref pref prev next nref lref last post