RE: Bldgl. E23-1st floor Urgent Care Shutdown Request
daemon@ATHENA.MIT.EDU (Robert Bright)
Wed May 22 08:39:33 2013
From: Robert Bright <BRIG@med.mit.edu>
To: "shutdown-response@mit.edu" <shutdown-response@mit.edu>,
"undisclosed_recipients@mit.edu" <undisclosed_recipients@mit.edu>
CC: "bdrink@mit.edu" <bdrink@mit.edu>,
"shutdowns@mit.edu"
<shutdowns@mit.edu>,
"sgilliga@mit.edu" <sgilliga@mit.edu>,
"whomeyer@mit.edu" <whomeyer@mit.edu>
Date: Wed, 22 May 2013 12:39:07 +0000
Message-ID: <409149FB0095F646B142F1C6538C9CD88FE17503@Exchange1.medical.ms.mit.edu>
In-Reply-To: <8247962AAFC24F14B10AD7C087C14D82@facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit
OK
-----Original Message-----
From: shutdown-response@mit.edu [mailto:shutdown-response@mit.edu]
Sent: Tuesday, May 21, 2013 3:23 PM
To: undisclosed_recipients@mit.edu
Cc: bdrink@mit.edu; shutdowns@mit.edu; sgilliga@mit.edu; whomeyer@mit.edu
Subject: Bldgl. E23-1st floor Urgent Care Shutdown Request
Importance: High
The following Normal Building Power shutdown request for Bldg. E23-1st flr Urgent Care on Friday, May 24, 2013 is for your information and response. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know whether this does or does not have your approval.
Thank you,
Bernadette Drinkwater
Repair and Maintenance
x3-0938
We request a bldg E23-1st floor Urgent Care panel P-1 normal bldg power shutdown from 3 AM to 5 AM on Friday, May 24th, 2013 for Crocker Electric to tie-into three existing spares (7, 9, 11) for pharmacy dispensing area receptacles and as part of the E23 pharmacy storefront project by Elaine Construction (Bernie Cincotta 617-590-3944). Kim Sutherland 8-5962 and Biss Teelucksingh 2-5972 are the MIT project managers.
Effects; general, reception and exam room dedicated circuits; Urgent Care lighting; security camera; electric wall heaters; copy machine; automatic doors. Emergency power remains unaffected.
Type: Normal
Date: May 24, 2013
Day: Friday
Time: 3:00am - 5:00am
Building(s): E23
Room(s): 1st floor
System: Normal Bldg. Power
Duration: 2 hours
Reason:
To tie in power to recepticles in the pharmacy dispensing area.
Effect:
Loss of power.