[169227] in Hotline Meeting
Bldg. E25-Floors 1- 6 Heating Hot Water Shutdown
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Mon May 13 14:20:34 2013
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <plyons@MIT.EDU>, <biss@MIT.EDU>
Date: Mon, 13 May 2013 14:20:26 -0400
Message-ID: <A262534E819B4C0C879B5B9D4292243C@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following Heating Hot Water Shutdown is for bldg. E25 - floors 1 - 6 is on Friday, May 17, 2013 from 6:00am - 2:00pm is for your information and approval. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: May 17, 2013
Day: Friday
Time: 6:00am - 2:00pm
Building(s): E25
Room(s): floors 1 - 6
System: heating hot water, supply heating
Duration: 6:00am - 2:00pm
Reason:
We request a bldg E25-floors 1 thru 6 heating hot water shutdown from 6 AM to 2 PM on Friday, May 17th, 2013 for Beacon Pipe (Dennis Minahan 781-589-6863) to reconfigure some 6th floor heating hot water piping and install isolation valves as part of the E25-6th floor Prof McGee Lab cleanroom project by DC Beane (Ryan Kucinski 617-997-9498). Paul Murphy 4-6163 and Biss Teelucksingh 2-5972 are the MIT project managers.
Effect:
Loss of heating hot water and supply heating for the duration of this shutdown.