Bldg. E15-015,016,023,023A,039,040 (015 Lab entryway project) Normal Electrical 120V/208V Building Power Shutdown.
daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Fri May 3 12:56:12 2013
From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <jennygar@MIT.EDU>, <pisanin@MIT.EDU>
Date: Fri, 3 May 2013 12:56:05 -0400
Message-ID: <C08F6146B1DD48B1966DC198C7C3A90D@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message
The following Normal Electrical 120V/208V Building Power Shutdown is for bldg. E15-015,016,023,023A,039,040 (015 Lab entryway project) on Tuesday, May 7, 2013 from 1:00pm - 3:00pm is for your information and approval. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: May 7, 2013
Day: Tuesday
Time: 1:00PM - 3:00PM
Building(s): E15
Room(s): 015,016,023,023A,039,040 (015 Lab entryway project)
System: Normal Electrical 120V/208V Building Power
Duration: 1:00PM - 3:00PM
Reason:
We request a bldg E15-023 lab power panel RP1 normal 208V/120V power shutdown from 1 PM to 3 PM on Tuesday afternoon, May 7th, 2013 for MacNichol Electric (Jesse Pothier 617-592-9427) to replace the 4 gage wiring between panels RP1 in 023 and RP1A in 015 with 1 gage wiring and also to install additional circuit breakers in panel RP1A for some new lab equipment/freezer and as part of the E15-015 entryway project by Acella Construction (Scott Brash 781-812-6066). Sudy Nally 8-8010 and Nicole Pisani 5-5157 are the MIT project managers.
All power in labs E15-015, 016, 023/023A, 039 and 040 will be affected.
Effect:
Loss of normal building power for the duration of this shutdown.