Approved - NEED APPROVAL - DATE/TIME CHANGED - Bldg. 7-All Fire

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Fri May 3 10:40:56 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: Jim Harrington <lordjim@mit.edu>, "laugh@mit.edu" <laugh@mit.edu>,
        "tommyl@mit.edu" <tommyl@mit.edu>, "myersm@MIT.EDU" <myersm@mit.edu>,
        "skendall@mit.edu" <skendall@mit.edu>,
        OPS RM Campus Services Main
	<rm-mcs@mit.edu>,
        Ops Custodial Admin & Support Staff <cust-staff@mit.edu>,
        "gearin@mit.edu" <gearin@mit.edu>,
        "segaloff@MIT.EDU" <segaloff@mit.edu>, "jcoen@mit.edu" <jcoen@mit.edu>,
        "gayle@mit.edu" <gayle@mit.edu>, "Michael
 Smith" <masmith@mit.edu>,
        "sbghosh@MIT.EDU" <sbghosh@mit.edu>, "fenner@mit.edu" <fenner@mit.edu>,
        "annm@mit.edu" <annm@mit.edu>, "mberg@mit.edu" <mberg@mit.edu>,
        "jbnorman@mit.edu" <jbnorman@mit.edu>,
        "bridburg@MIT.EDU" <bridburg@mit.edu>, "whc@mit.edu" <whc@mit.edu>,
        "hillery@mit.edu" <hillery@mit.edu>,
        "kyegian@MIT.EDU" <kyegian@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        Gary Saffie
	<gsaffie@plant.mit.edu>,
        Ops RM Shutdown <rm-shutdown@mit.edu>, DOF EHS
	<dof-ehs@mit.edu>,
        "cp-command@mit.edu" <cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
        "DOF
 Customer Service Center" <dof-csc@mit.edu>,
        "Ops Custodial Admin & Support
 Staff" <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>
Date: Fri, 3 May 2013 10:40:49 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13AD0B5150@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13AD0B5150dofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13AD0B5150dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following Approved Fire Alarm Shutdown (w/*brief live audible test on 5=
/7 at 6AM) is for bldg. 7-All on **DATE/TIME CHANGED - TUESDAY, May 7, 2013=
 from 6:00am - 7:30am is for your information.  Any questions please contac=
t Billy Homeyer x8-0432.



Thank you,

Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: May 7, 2013  **DATE CHANGED TO MAY 7, 2013 **
Day: Thursday///  **CHANGED DAY to TUESDAY**
Time: 6:00am - 7:30am  **TIME CHANGED**
Building(s): 7
Room(s): All
System: Fire Alarm
Duration: 6:00am - 7:30am
Reason:  ** The shutdown is rescheduled for just Tuesday, May 7, 2013 from =
 6:00am to 7:30am with a brief live test before 7:30 - THIS WAS APPROVED PE=
R PRESIDENT'S OFFICE**

We request bldg 7-all fire alarm shutdowns at 6 AM to 10 AM on Thursday, Ma=
y 2nd and Friday, May 3rd, 2013 for MacNichol Electric (Tom Durant 978-930-=
6001) and Simplex (Bob Gauvin 781-603-7765) to tie-in, program and test tem=
porary heat detectors installed in the 7-304 SAP construction area.  We wil=
l conduct a *brief live audible test on Friday, May 3rd, 2013 between 6 AM =
- 7 AM of the bldg 7-fire alarm system* as part of the SAP renovation of fo=
rmer Rotch Library project by Renovations, Inc. (Jim Abbisso 617-594-7650).=
  Biss Teelucksingh is the MIT project manager 2-5972.

Effect:
Loss of fire alarms for the duration of this shutdown.



--_000_4EEA516695C10541B7CB963FF54A56AF13AD0B5150dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
 #800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following<font color=3D"#1F497D"> </font>Approved Fire Alarm Shutd=
own (w/*brief live audible test on 5/7 at 6AM) is for bldg. 7-All on **<b>D=
ATE/TIME CHANGED</b> - TUESDAY, May 7, 2013 from 6:00am - 7:30am is for you=
r <b>information</b>.&nbsp; Any questions
please contact Billy Homeyer x8-0432.</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Thank you,</div>
<div>&nbsp;</div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div>&nbsp;</div>
<div>Type: Normal</div>
<div>Date: May 7, 2013&nbsp; **DATE CHANGED TO MAY 7, 2013 **</div>
<div>Day: Thursday///&nbsp; **CHANGED DAY to TUESDAY**</div>
<div>Time: 6:00am - 7:30am&nbsp; **TIME CHANGED**</div>
<div>Building(s): 7</div>
<div>Room(s): All</div>
<div>System: Fire Alarm</div>
<div>Duration: 6:00am - 7:30am</div>
<div>Reason:&nbsp; <b>**</b><font color=3D"#1F497D"><b> The shutdown is res=
cheduled for just Tuesday, May 7, 2013 from&nbsp; 6:00am to 7:30am with a b=
rief live test before 7:30</b></font><font color=3D"#1F497D"><b> - THIS WAS=
 APPROVED PER PRESIDENT&#8217;S OFFICE</b></font><font color=3D"#1F497D"><b=
>**</b></font></div>
<div>&nbsp;</div>
<div>We request bldg 7-all fire alarm shutdowns at 6 AM to 10 AM on Thursda=
y, May 2nd and Friday, May 3rd, 2013 for MacNichol Electric (Tom Durant 978=
-930-6001) and Simplex (Bob Gauvin 781-603-7765) to tie-in, program and tes=
t temporary heat detectors installed
in the 7-304 SAP construction area.&nbsp; We will conduct a *brief live aud=
ible test on Friday, May 3rd, 2013 between 6 AM - 7 AM of the bldg 7-fire a=
larm system* as part of the SAP renovation of former Rotch Library project =
by Renovations, Inc. (Jim Abbisso 617-594-7650).&nbsp;
Biss Teelucksingh is the MIT project manager 2-5972.</div>
<div>&nbsp;</div>
<div>Effect: </div>
<div>Loss of fire alarms for the duration of this shutdown. </div>
<div>&nbsp;</div>
<div>&nbsp;</div>
</font>
</body>
</html>

--_000_4EEA516695C10541B7CB963FF54A56AF13AD0B5150dofexchmbx01f_--

home help back first fref pref prev next nref lref last post