NEED APPROVAL - UPDATED: Bldg. E19 - All Domestic Hot and Cold
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Thu May 2 09:31:09 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "barreiro@mit.edu" <barreiro@mit.edu>, "dcamp@MIT.EDU" <dcamp@mit.edu>,
"alimart@mit.edu" <alimart@mit.edu>,
"Swetzel@mit.edu" <Swetzel@mit.edu>,
"OPS RM Campus Services East" <rm-ecs@mit.edu>,
Michael Fahie
<mfahie@plant.mit.edu>,
"Martin O'Brien" <mobrien@plant.mit.edu>, Ops RM All
<rm-org@mit.edu>,
"adaz@mit.edu" <adaz@mit.edu>, "maustin@mit.edu"
<maustin@mit.edu>,
"mcpierce@MIT.EDU" <mcpierce@mit.edu>,
"wturner@mit.edu"
<wturner@mit.edu>,
"opsnote@mit.edu" <opsnote@mit.edu>,
"e19site@mit.edu"
<e19site@mit.edu>,
"W92site@mit.edu" <W92site@mit.edu>,
"segaloff@MIT.EDU"
<segaloff@mit.edu>,
"tquinn@mit.edu" <tquinn@mit.edu>,
"pconnell@MIT.EDU"
<pconnell@mit.edu>, "annm@mit.edu" <annm@mit.edu>,
"heatherg@mit.edu"
<heatherg@mit.edu>,
"ejstratt@mit.edu" <ejstratt@mit.edu>,
"lhill@mit.edu"
<lhill@mit.edu>,
"lab-manager@mit.edu" <lab-manager@mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
"plyons@mit.edu" <plyons@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>,
David Hingston
<dhingsto@plant.mit.edu>
Date: Thu, 2 May 2013 09:30:58 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13ACBBE687@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13ACBBE687dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13ACBBE687dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following UPDATED Domestic Hot and Cold Water and Non - Potable Hot and=
Cold Water shutdown is for bldg. E19 - All on Saturday, May 4, 2013 **TIME=
S CHANGED now from 6:00am - Finish - additional work needs to be done on Ac=
id Waste Pipe at this same time, this is for your information and approval.=
Any questions please contact Dave Hingston x4-4548.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: May 4, 2013
Day: Saturday
Time: 6:00am - FINISH **TIMES CHANGED**
Building(s): E19
Room(s): All
System: hot/cold domestic water, lab process hot/cold water, sanitary drain=
age. ---
Duration: 6:00am - FINISH **TIMES CHANGED**
Reason: ***Additional work is need to be done on the Acid Waste Pipe at thi=
s same time***
This is to make repairs to an 6' crack in a sanitary waste pipe.
Effect: ***
Loss of hot/cold domestic water, lab process hot/cold, sanitary drainage fo=
r the duration of this shutdown. Signs will be posted.
--_000_4EEA516695C10541B7CB963FF54A56AF13ACBBE687dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following UPDATED Domestic Hot and Cold Water and Non - Potable Ho=
t and Cold Water shutdown is for bldg. E19 - All on Saturday, May 4, 2013 *=
*<b>TIMES CHANGED</b> now from 6:00am - Finish - additional work needs to b=
e done on Acid Waste Pipe at this
same time, this is for <b>your information and approval</b>. Any ques=
tions please contact Dave Hingston x4-4548. </div>
<div> </div>
<div> </div>
<div><b>Would you please let us know if this does or does not have your app=
roval.</b></div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: May 4, 2013</div>
<div>Day: Saturday</div>
<div>Time: 6:00am - FINISH **TIMES CHANGED**</div>
<div>Building(s): E19</div>
<div>Room(s): All</div>
<div>System: hot/cold domestic water, lab process hot/cold water, sanitary =
drainage. ---</div>
<div>Duration: 6:00am - FINISH **TIMES CHANGED**</div>
<div>Reason: ***<b>Additional work is need to be done on the Acid Waste Pip=
e at this same time</b>***</div>
<div>This is to make repairs to an 6' crack in a sanitary waste pipe.</div>
<div> </div>
<div>Effect: ***</div>
<div>Loss of hot/cold domestic water, lab process hot/cold, sanitary draina=
ge for the duration of this shutdown. Signs will be posted.</div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13ACBBE687dofexchmbx01f_--