| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
Mime-Version: 1.0 Message-Id: <p05010409b83eb596f26f@[18.152.0.142]> Date: Thu, 13 Dec 2001 15:21:47 -0500 To: delivery@mit.edu From: Barbara Goguen <goguen@MIT.EDU> Cc: tooltime-team@mit.edu Content-Type: text/plain; charset="us-ascii" ; format="flowed" project name: casetracker 1.5 project leader: barbara goguen, oliver thomas report date:december 13, 2001 submitted by: barbara goguen url: http://web.mit.edu/tooltime/notebook/ accomplishments past period: - wrote instructions for upgrading the oracle client from 7 to 8, and trained fred baars on how to upgrade all help desk call center machines. - drafted a glossary of terms; posted documents on the email interface and administrator functions - drafted several initial casetracker rules of use to facilitate a discussion with a broader audience - continued to plan for iap as the time to upgrade the production machine to oracle 8.1.7 - updated the database on the test machine - conducted design meeting to clarify issues around limited additional features to add to the new web client including additional search capabilities, additional fields, and case lists goals for coming period: - follow-up with east about moving some casetracker work into their workspace - prepare a build procedure - prepare a plan for switching over to production during iap - review oracle audit file to identify and upgrade all installations of casetracker desktop - develop workflow document describing how to transfer a case from one group to another - take brainstormed lists from design meeting and organize and prioritize into tasks lists issues: - time is running short between now and january; need to determine what we can and cannot get done for a january release key learning: - sometimes we need to be reminded to keep things simple team dynamics: - all is well
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |