[50192] in North American Network Operators' Group

home help back first fref pref prev next nref lref last post

RE: effects of NYC power outage

daemon@ATHENA.MIT.EDU (Sean Donelan)
Mon Jul 22 13:37:18 2002

Date: Mon, 22 Jul 2002 13:36:49 -0400 (EDT)
From: Sean Donelan <sean@donelan.com>
To: Alex Rubenstein <alex@nac.net>
Cc: Phil Rosenthal <pr@isprime.com>,
	'Marshall Eubanks' <tme@multicasttech.com>,
	'Craig Partridge' <craig@aland.bbn.com>,
	"nanog@merit.edu" <nanog@merit.edu>
In-Reply-To: <Pine.WNT.4.43.0207221153480.3540-100000@NEON.hq.nac.net>
Errors-To: owner-nanog-outgoing@merit.edu



I have never seen the final root cause (actually direct cause, we know
what the root cause was) report from Telehouse.  Although I can understand
why Telehouse wouldn't want to say what happened.

Between replacing water pumps, reports of contanimation inside and
outside the cooling system,  fuel delivery delays, etc I'm not certain
there was a single cause.  From the outside there seemed to be multiple
events, each with different direct causes.


On Mon, 22 Jul 2002, Alex Rubenstein wrote:
> Nope.
>
> The main generator for the 5th floor apparently ran for a while, but the
> radiator became clogged with garbage floating aroung in the air, and
> therefore couldn't cool itself, and overheated. They shut it down to
> prevent it from hurting itself.
>
> Fuel was another issue.


home help back first fref pref prev next nref lref last post