We have an MPLS backbone from Level3 and are experiencing issues between
two of our San Francisco Bay Area locations =E2=80=93 namely our HQ in Burl=
ingame,
CA and our Savvis/CenturyLink Data Center in Santa Clara, CA. Ping
response times between these 2 sites are within the normal range, but our
Applications are timing out. We=E2=80=99ve obviously done a ton of troubles=
hooting
on the Application side of things, but everything points back to a circuit
issue and after a lot of testing we are scratching our heads trying to
narrow down this issue. So I wanted to post to this list to see if anyone
else has noticed issues with their Level3 circuits in the Bay Area over the
last 2 days as well?
Thanks for your feedback!
Regards, Leah