[119031] in North American Network Operators' Group

home help back first fref pref prev next nref lref last post

Re: HE.net, Fremont-2 outage?

daemon@ATHENA.MIT.EDU (Stef Walter)
Wed Nov 4 21:52:48 2009

Date: Wed, 04 Nov 2009 20:51:44 -0600
From: Stef Walter <stef-list@memberwebs.com>
To: nevin@enginehosting.com
In-Reply-To: <1257388693.973329082@192.168.1.71>
Cc: nanog@nanog.org
Reply-To: stef@memberwebs.com
Errors-To: nanog-bounces+nanog.discuss=bloom-picayune.mit.edu@nanog.org

nevin@enginehosting.com wrote:
> The 2002 press release is talking about the Fremont 1 facility not
> the newer Fremont 2 facility.  Fremont 1 has a fixed power
> availability to each cabinet of just a single 15A circuit.  You can
> not modify or change that, and if you need more power your option is
> to add another cabinet. You are not allowed to route power cords
> between cabinets so you are forever running a single circuit and 80%
> of your 15A circuit max.  The data center was built in a different
> time.

The same is true of racks in most of the suites in the more recent
Freemont 2 facility.