[9187] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Re: E40-008 A/C alarm

daemon@ATHENA.MIT.EDU (larugsi@Athena.MIT.EDU)
Fri May 22 14:19:04 1992

From: larugsi@Athena.MIT.EDU
To: jjmorey@Athena.MIT.EDU
Cc: hotline@Athena.MIT.EDU, dcns-cluster@Athena.MIT.EDU,
Date: Fri, 22 May 92 14:18:42 EDT

Hi JJ,
     Rumor has it that a minor power hit happened last night at approx. 6:30
p.m. I have been trying to verify this. Nothing as yet.. This may of set off 
the A/C units alarm. It was rumored that it was on the East side of campus.
                            --Lou
------- Forwarded Message

Received: by E40-PO.MIT.EDU (5.45/4.7) id AA29389; Fri, 22 May 92 08:28:24 EDT
Received: from ANGLER.MIT.EDU by Athena.MIT.EDU with SMTP
	id AA25265; Fri, 22 May 92 08:28:12 EDT
From: jjmorey@Athena.MIT.EDU
Received: by angler.MIT.EDU (5.61/4.7) id AA11229; Fri, 22 May 92 08:28:09 -0400
Message-Id: <9205221228.AA11229@angler.MIT.EDU>
To: burke@Athena.MIT.EDU
Cc: hotline@Athena.MIT.EDU, dcns-cluster@Athena.MIT.EDU, op@Athena.MIT.EDU,
        jis@Athena.MIT.EDU, hoffmann@Athena.MIT.EDU
Subject: E40-008 A/C alarm
Date: Fri, 22 May 92 08:28:07 EDT


I found the alarm going off in the E40 machine room.  It was approx
50-55degrees in the room.  A/C unit is the one on top of ramp.
I called PP and had someone come over ASAP (Richie Sargeant).  I had
reset alarm and all lights stayed lit on control panel.  Richie 
power cycled unit and alarm came back on which Richie hit the reset
switch and all control panel lights came back on.  Richie will be 
contacting Warren Scott to have a work order on unit.

I believe that Kim's group will be handleing it from here in.

JJ


------- End of Forwarded Message


home help back first fref pref prev next nref lref last post