[76395] in Hotline Meeting
Bldg. NW13 - Revised Air Handler 18 - CV1, Chilled Water, Control
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue May 4 07:37:16 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D7259C@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'actinide@mit.edu'" <actinide@mit.edu>,
"'bernardj@mit.edu'"
<bernardj@mit.edu>,
"'cp-command@mit.edu'" <cp-command@mit.edu>, D-Zone
<D-Zone@mit.edu>,
"'devries@mit.edu'" <devries@mit.edu>,
"'eslau@mit.edu'" <eslau@mit.edu>, "'fafrey@mit.edu'" <fafrey@mit.edu>,
"'fredmcw@mit.edu'" <fredmcw@mit.edu>,
"'galanek@mit.edu'"
<galanek@mit.edu>,
"'ginipig@mit.edu'" <ginipig@mit.edu>,
"'kczer@mit.edu'" <kczer@mit.edu>,
"'klnoyes@mit.edu'" <klnoyes@mit.edu>,
"'pbrenton@mit.edu'" <pbrenton@mit.edu>,
"'pila@mit.edu'" <pila@mit.edu>, "'safety@mit.edu'" <safety@mit.edu>,
"'wendell@mit.edu'"
<wendell@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>,
"'rbatista@mit.edu'" <rbatista@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Tue, 4 May 2004 07:36:35 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C431CC.0E3796B0"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C431CC.0E3796B0
Content-Type: text/plain
> To: actinide@mit.edu; bernardj@mit.edu; cp-command@mit.edu; D-Zone;
> devries@mit.edu; eslau@mit.edu; fafrey@mit.edu; fredmcw@mit.edu;
> galanek@mit.edu; ginipig@mit.edu; kczer@mit.edu; klnoyes@mit.edu;
> pbrenton@mit.edu; pila@mit.edu; safety@mit.edu; wendell@mit.edu;
> shutdowns@mit.edu; rbatista@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. NW13 - Revised Air Handler 18 - CV1, Chilled Water,
> Control Air Compressor System Upgrade Request
>
>
The following revised Air Handler 18, CV1, Chilled Water and Control Air
Compressor Control System Upgrade request for Bldg. NW13 on Thursday, May 6,
2004 is for your information and comment. Would you please let me know
whether this does or does not meet with your approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
P.S. This work is scheduled for Thursday, May 6 - not May 5.
> Status: Normal
> Building: NW13
> Date: 5/6/2004
> Day: Thursday
> Time: 7 AM - 11 AM
> System: Air Handler 18 - CV1, Chilled Water System and Control Air
> Compresor
> Duration: 4 hours
> Reason:
> Control System Upgrade. There will be a loss of control and monitoring of
> Air Handler 18, CV1 (hot water converter) and the chilled water system by
> the Operations Center during the Control System Upgrade period. There will
> be a loss of monitoring of the Control Air Compressor by the Operations
> Center during the Control Systems Upgrade period.
>
> Effect:
> Only Air Handler 18 will be shutdown for approximately 40 minutes within
> the above-listed time frame. This means there will be no supply
> ventilation (air from outside) or supply cooling (via ceiling supply fans)
> for 40 minutes in Bldg. NW13.
>
>
------_=_NextPart_001_01C431CC.0E3796B0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. NW13 - Revised Air Handler 18 - CV1, Chilled Water, =
Control Air Compressor System Upgrade Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">actinide@mit.edu; bernardj@mit.edu; =
cp-command@mit.edu; D-Zone; devries@mit.edu; eslau@mit.edu; =
fafrey@mit.edu; fredmcw@mit.edu; galanek@mit.edu; ginipig@mit.edu; =
kczer@mit.edu; klnoyes@mit.edu; pbrenton@mit.edu; pila@mit.edu; =
safety@mit.edu; wendell@mit.edu; shutdowns@mit.edu; =
rbatista@mit.edu</FONT></P>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. NW13 - Revised =
Air Handler 18 - CV1, Chilled Water, Control Air Compressor System =
Upgrade Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following revised Air =
Handler 18, CV1, Chilled Water and Control Air Compressor Control =
System Upgrade request for Bldg. NW13 on Thursday, May 6, 2004 is for =
your information and comment. Would you please let me know =
whether this does or does not meet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">P.S. This work is scheduled =
for Thursday, May 6 - not May 5.</FONT>
</P>
<BR>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">NW13</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">5/6/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Thursday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 11 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Air Handler 18 - CV1, Chilled Water =
System and Control Air Compresor</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Control System Upgrade. There =
will be a loss of control and monitoring of Air Handler 18, CV1 (hot =
water converter) and the chilled water system by the Operations Center =
during the Control System Upgrade period. There will be a loss of =
monitoring of the Control Air Compressor by the Operations Center =
during the Control Systems Upgrade period.</FONT></P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Only Air Handler 18 will be =
shutdown for approximately 40 minutes within the above-listed time =
frame. This means there will be no supply ventilation (air from =
outside) or supply cooling (via ceiling supply fans) for 40 minutes in =
Bldg. NW13.</FONT></P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C431CC.0E3796B0--