[76365] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Power outage on Monday, May 3

daemon@ATHENA.MIT.EDU (Ruth Davis)
Mon May 3 15:37:49 2004

Message-ID: <568F0AEE7A57D511923900508B5564510296E26C@plantnt.facilities.ms.mit.edu>
From: Ruth Davis <rtdavis@PLANT.MIT.EDU>
To: "'plant-notify@mit.edu'" <plant-notify@mit.edu>
Cc: "'wgcc@mit.edu'" <wgcc@mit.edu>
Date: Mon, 3 May 2004 15:35:36 -0400 
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C43145.CE8C4460"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C43145.CE8C4460
Content-Type: text/plain;
	charset="ISO-8859-1"

Dear Colleagues:

At approximately 1:15 pm on Monday, May 03, 2004, NSTAR had a major outage
in the Cambridge area. The MIT Central Utilities Plant lost power as a
result of this incident. 

As of 3:30 pm, power has been restored to the following buildings: E23, E25,
68, 56, E17, E18, 13, W45 - W91, 39, and 40. Other buildings continue to
come on line. The Central Utilities Plant is being brought on
simultaneously. 

We expect all MIT buildings and their systems will be back on line by 5:00
p.m. today.

Further information may be obtained from the Department of Facilities
website http://web.mit.edu/facilities/index.html: view outages and log
section or from IS&T 3-Down site: http://is3down.mit.edu/fcgi-bin/3down

Ruth T. Davis
Manager of Communications and
Assistant to the Director for Special Projects
MIT Department of Facilities
NE49-2200
77 Massachusetts Avenue
Cambridge, MA 02139
Phone: 617-253-7299
Fax: 617-452-2342
Email: rtdavis@mit.edu


------_=_NextPart_001_01C43145.CE8C4460
Content-Type: text/html;
	charset="ISO-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DISO-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Power outage on Monday, May 3</TITLE>
</HEAD>
<BODY>

<P><FONT FACE=3D"Times New Roman">Dear Colleagues:</FONT>
</P>

<P><FONT FACE=3D"Times New Roman">At approximately 1:15 pm on Monday, =
May 03, 2004, NSTAR had a major outage in the Cambridge area. The MIT =
Central Utilities Plant lost power as a result of this incident. =
</FONT></P>

<P><FONT FACE=3D"Times New Roman">As of 3:30 pm, power has been =
restored to the following buildings: E23, E25, 68, 56, E17, E18, 13, =
W45 - W91, 39, and 40. Other buildings continue to come on line. The =
Central Utilities Plant is being brought on simultaneously. </FONT></P>

<P><FONT FACE=3D"Times New Roman">We expect all MIT buildings and their =
systems will be back on line by 5:00 p.m. today.</FONT>
</P>

<P><FONT FACE=3D"Times New Roman">Further information may be obtained =
from the Department of Facilities website =
http://web.mit.edu/facilities/index.html: view outages and log section =
or from IS&amp;T 3-Down site: <A =
HREF=3D"http://is3down.mit.edu/fcgi-bin/3down" =
TARGET=3D"_blank">http://is3down.mit.edu/fcgi-bin/3down</A></FONT></P>

<P><FONT FACE=3D"Times New Roman">Ruth T. Davis</FONT>
<BR><FONT FACE=3D"Times New Roman">Manager of Communications and</FONT>
<BR><FONT FACE=3D"Times New Roman">Assistant to the Director for =
Special Projects</FONT>
<BR><FONT FACE=3D"Times New Roman">MIT Department of Facilities</FONT>
<BR><FONT FACE=3D"Times New Roman">NE49-2200</FONT>
<BR><FONT FACE=3D"Times New Roman">77 Massachusetts Avenue</FONT>
<BR><FONT FACE=3D"Times New Roman">Cambridge, MA 02139</FONT>
<BR><FONT FACE=3D"Times New Roman">Phone: 617-253-7299</FONT>
<BR><FONT FACE=3D"Times New Roman">Fax: 617-452-2342</FONT>
<BR><FONT FACE=3D"Times New Roman">Email: rtdavis@mit.edu</FONT>
</P>

</BODY>
</HTML>
------_=_NextPart_001_01C43145.CE8C4460--

home help back first fref pref prev next nref lref last post