[74128] in Hotline Meeting
Bldg. 66 - Air Handlers 3, 6 and 7/Chilled Water System Control S
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Mar 24 10:05:09 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D72376@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
"'haverty@mit.edu'" <haverty@MIT.Edu>,
"'kkgleasn@mit.edu'"
<kkgleasn@MIT.Edu>,
"'schedule@mit.edu'" <schedule@MIT.Edu>,
"'swetzel@mit.edu'" <swetzel@MIT.Edu>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 24 Mar 2004 10:04:45 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C411B1.57CA8430"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C411B1.57CA8430
Content-Type: text/plain
> To: A-Zone; Cust-Coach; haverty@mit.edu; kkgleasn@mit.edu;
> schedule@mit.edu; swetzel@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 66 - Air Handlers 3, 6 and 7/Chilled Water System
> Control System Upgrade Request
>
>
The following air handlers 3, 6 and 7/chilled water control system upgrade
request for Bldg. 66 - Floors 1 through 5 Interior area, Hood Make-Up Air
and Basement on Tuesday, 3/30/04 is for your information and comment. Would
you please let me know whether this does or does not meet with your
approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 66 - Floors 1 through 5 (Interior areas), Hoods-Make-Up Air and
> Basement
> Date: 3/30/2004
> Day: Tuesday
> Time: 7 AM - 11 AM
> System: Air Handlers 3, 6 and 7/Chilled Water System
> Duration: 4 hours
> Reason:
> Control System Upgrade. Loss of control and monitoring by the Operations
> Center on Air Handlers 3, 6, 7 and chilled water system.
>
> Effect:
> Loss of supply ventilation, supply cooling, supply heating and
> exhaust-laboratory air in the above-mentioned areas for approximately 1
> hour during the 4-hour shutdown period. There will be no interruption of
> service in the chilled water system.
>
>
------_=_NextPart_001_01C411B1.57CA8430
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 66 - Air Handlers 3, 6 and 7/Chilled Water System Control =
System Upgrade Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">A-Zone; Cust-Coach; haverty@mit.edu; =
kkgleasn@mit.edu; schedule@mit.edu; swetzel@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 66 - Air =
Handlers 3, 6 and 7/Chilled Water System Control System Upgrade =
Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following air handlers 3, =
6 and 7/chilled water control system upgrade request for Bldg. 66 =
- Floors 1 through 5 Interior area, Hood Make-Up Air and Basement on =
Tuesday, 3/30/04 is for your information and comment. Would you =
please let me know whether this does or does not meet with your =
approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">66 - Floors 1 through 5 (Interior =
areas), Hoods-Make-Up Air and Basement</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">3/30/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Tuesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 11 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Air Handlers 3, 6 and 7/Chilled Water =
System</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Control System Upgrade. Loss =
of control and monitoring by the Operations Center on Air Handlers 3, =
6, 7 and chilled water system.</FONT></P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of supply ventilation, =
supply cooling, supply heating and exhaust-laboratory air in the =
above-mentioned areas for approximately 1 hour during the 4-hour =
shutdown period. There will be no interruption of service in the =
chilled water system.</FONT></P>