Bldg. 66 - Air Handlers 1, 2 , Hot Water Converters 1 and 2 Contr
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Mar 24 09:40:55 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D72375@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
"'haverty@mit.edu'" <haverty@MIT.Edu>,
"'kkgleasn@mit.edu'"
<kkgleasn@MIT.Edu>,
"'schedule@mit.edu'" <schedule@MIT.Edu>,
"'swetzel@mit.edu'" <swetzel@MIT.Edu>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 24 Mar 2004 09:40:35 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C411AD.F75B32A0"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C411AD.F75B32A0
Content-Type: text/plain
> To: A-Zone; Cust-Coach; haverty@mit.edu; kkgleasn@mit.edu;
> schedule@mit.edu; swetzel@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 66 - Air Handlers 1, 2 , Hot Water Converters 1 and 2
> Control System Upgrade Request
>
>
The following air handlers 1, 2 and hot water converters 1 and 2 control
system upgrade request for Bldg. 66 floors 1 through 5 North and floors 1
through 5 South on Monday, 3/29/04 is for your information and comment.
Would you please let me know whether this does or does not meet with your
approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 66 - Floors 1 through 5 North and South
> Date: 3/29/2004
> Day: Monday
> Time: 7 AM - 11 AM
> System: Air Handlers 1 and 2 and Hot Water Converters 1 and 2/induction
> units
> Duration: 4 hours
> Reason:
> Control System Upgrade.
>
> Effect:
> Loss of supply ventilation, supply cooling and supply heating in Bldg. 66
> - Floors 1 through 5 North and South for approximately 30 minutes within
> the 4-hour shutdown period. There will be loss of control and monitoring
> by The Operations Center.
>
>
------_=_NextPart_001_01C411AD.F75B32A0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 66 - Air Handlers 1, 2 , Hot Water Converters 1 and 2 =
Control System Upgrade Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">A-Zone; Cust-Coach; haverty@mit.edu; =
kkgleasn@mit.edu; schedule@mit.edu; swetzel@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 66 - Air =
Handlers 1, 2 , Hot Water Converters 1 and 2 Control System Upgrade =
Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following air handlers 1, =
2 and hot water converters 1 and 2 control system upgrade request for =
Bldg. 66 floors 1 through 5 North and floors 1 through 5 South on =
Monday, 3/29/04 is for your information and comment. Would you =
please let me know whether this does or does not meet with your =
approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">66 - Floors 1 through 5 North and =
South</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">3/29/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Monday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 11 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Air Handlers 1 and 2 and Hot Water =
Converters 1 and 2/induction units</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Control System =
Upgrade.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of supply ventilation, =
supply cooling and supply heating in Bldg. 66 - Floors 1 through 5 =
North and South for approximately 30 minutes within the 4-hour shutdown =
period. There will be loss of control and monitoring by The Operations =
Center.</FONT></P>