[71816] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. E52 - Supply Ventilation, Supply Cooling and Exhaust-Toilet

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jan 30 10:33:45 2004

Message-ID: <568F0AEE7A57D511923900508B55645103D72061@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'aed@mit.edu'" <aed@mit.edu>, "'alterra@mit.edu'" <alterra@mit.edu>,
        "'dori123@mit.edu'" <dori123@mit.edu>, E-Zone <E-Zone@mit.edu>,
        "'gwj@mit.edu'" <gwj@mit.edu>, "'lhill@mit.edu'" <lhill@mit.edu>,
        "'lmorales@mit.edu'" <lmorales@mit.edu>,
        "'mscoppa@mit.edu'"
	 <mscoppa@mit.edu>,
        "'pconeeny@MIT.EDU'" <pconeeny@mit.edu>,
        "'rberlin@mit.edu'" <rberlin@mit.edu>,
        "'schedule@mit.edu'"
	 <schedule@mit.edu>,
        "'sdimond@mit.edu'" <sdimond@mit.edu>,
        "'wganger@mit.edu'" <wganger@mit.edu>,
        "'shutdowns@mit.edu'"
	 <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 30 Jan 2004 10:32:57 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C3E746.56347030"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C3E746.56347030
Content-Type: text/plain

> To: 	aed@mit.edu; alterra@mit.edu; dori123@mit.edu; E-Zone; gwj@mit.edu;
> lhill@mit.edu; lmorales@mit.edu; mscoppa@mit.edu; pconeeny@MIT.EDU;
> rberlin@mit.edu; schedule@mit.edu; sdimond@mit.edu; wganger@mit.edu;
> shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. E52 - Supply Ventilation, Supply Cooling and
> Exhaust-Toilet Air Shutdown Request
> 
> 
The following Supply Ventilation, Supply Cooling and Exhaust-Toilet Air
shutdown request for Blg. E52 on Wednesday, 2/4/04 is for your information
and comment.  Would you please let me know whether this does or does not
meet with your approval.

Thanks very much.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: E52 
> Date: 2/4/2004
> Day: Wednesday
> Time: 7 AM - 11 AM
> System: CV1 (will operate) Penthouse Base Air Handler Unit - Toilet
> Exhaust
> Duration: 4 hours
> Reason: 
> Control System Conversion.
> 
> Effect: 
> Loss of supply ventilation, supply cooling and exhaust-toilet air (this
> one down for approximately 1 hour only) during the 4-hour shutdown period.
> There will be a loss of control and monitoring by the Operations Center
> on Converter 1, Steam System, Penthouse and Base Air Handler system,
> Toilet Exhaust and Loss of monitoring only on the following systems:
> Chilled Water, Control Air Compressor and Sump System by the Operations
> Center.
> 
> 

------_=_NextPart_001_01C3E746.56347030
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. E52 - Supply Ventilation, Supply Cooling and =
Exhaust-Toilet Air Shutdown Request</TITLE>
</HEAD>
<BODY>

<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">aed@mit.edu; alterra@mit.edu; =
dori123@mit.edu; E-Zone; gwj@mit.edu; lhill@mit.edu; lmorales@mit.edu; =
mscoppa@mit.edu; pconeeny@MIT.EDU; rberlin@mit.edu; schedule@mit.edu; =
sdimond@mit.edu; wganger@mit.edu; shutdowns@mit.edu</FONT></P>

<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. E52 - Supply =
Ventilation, Supply Cooling and Exhaust-Toilet Air Shutdown =
Request</FONT>
</P>
<BR>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following Supply =
Ventilation, Supply Cooling and Exhaust-Toilet Air shutdown request for =
Blg. E52 on Wednesday, 2/4/04 is for your information and =
comment.&nbsp; Would you please let me know whether this does or does =
not meet with your approval.</FONT></P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">E52</FONT>=20
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">2/4/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Wednesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 11 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">CV1 (will operate) Penthouse Base Air =
Handler Unit - Toilet Exhaust</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Control System =
Conversion.</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of supply ventilation, =
supply cooling and exhaust-toilet air (this one down for approximately =
1 hour only) during the 4-hour shutdown period. There will be a loss of =
control and monitoring by the Operations Center&nbsp; on Converter 1, =
Steam System, Penthouse and Base Air Handler system, Toilet Exhaust and =
Loss of monitoring only on the following systems: Chilled Water, =
Control Air Compressor and Sump System by the Operations =
Center.</FONT></P>
<BR>

</BODY>
</HTML>
------_=_NextPart_001_01C3E746.56347030--

home help back first fref pref prev next nref lref last post