[66045] in Hotline Meeting
Bldg. 6 - Secondary Pumps 4 and 5/Supply Heating or Cooling Shutd
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed May 21 09:27:45 2003
Message-ID: <568F0AEE7A57D511923900508B556451023F1F25@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'khewitt@mit.edu'" <khewitt@mit.edu>,
"'rhasselt@mit.edu'"
<rhasselt@mit.edu>,
"'rrdasari@mit.edu'" <rrdasari@mit.edu>,
"'saraf@mit.edu'" <saraf@mit.edu>, "'vrusso@mit.edu'" <vrusso@mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>
Date: Wed, 21 May 2003 09:27:25 -0400
Dear Everyone:
I have not yet heard from you concerning the shutdown for Bldg. 6 - 301
through 318 and 401 through 416 shutdown request for tomorrow, Thursday,
5/22 from 7 AM to 3 PM. This shutdown would effect supply cooling or supply
heating via ceiling supply fans in the above-listed rooms. This is a weather
dependant shutdown - if it is cold outside then it will be loss of supply
heating or if it is warm then it will be a loss of supply cooling via
ceiling supply fans during the 8-hour shutdown period.
Of course in the rooms where there are window air conditioners - those areas
will have cooling.
Would you please let me know whether you do or do not approve of this
shutdown by 1:30 PM today if possible.
Thanks very much and I look forward to hearing from you.
Andrea Nichols
Repair and Maintenance
8-7872