[58484] in Hotline Meeting
Bldg. 6 - Water/Drainage Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Feb 27 11:21:38 2002
Message-ID: <568F0AEE7A57D511923900508B5564511564FA@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'efrank@mit.edu'" <efrank@mit.edu>,
"'chemistryhq@mit.edu'"
<chemistryhq@mit.edu>,
Cust-Coach <cust-coach@mit.edu>, "'ghughes@mit.edu'" <ghughes@mit.edu>,
"'glabonte@mit.edu'"
<glabonte@mit.edu>,
"'gsj@mit.edu'" <gsj@mit.edu>,
"'jsheytan@mit.edu'"
<jsheytan@mit.edu>,
"'khewitt@mit.edu'" <khewitt@mit.edu>,
"'mhankin@mit.edu'" <mhankin@mit.edu>,
"'rhasselt@MIT.EDU'"
<rhasselt@mit.edu>,
"'rjwilk@mit.edu'" <rjwilk@mit.edu>,
"'rrdasari@mit.edu'" <rrdasari@mit.edu>,
"'saraf@mit.edu'"
<saraf@mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'serotek@mit.edu'" <serotek@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'heatherg@mit.edu'" <heatherg@mit.edu>,
"'rjwilk@mit.edu'" <rjwilk@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
C-Zone
<C-Zone@mit.edu>
Date: Wed, 27 Feb 2002 11:21:25 -0500
MIME-Version: 1.0
Content-Type: text/plain
> To: efrank@mit.edu; chemistryhq@mit.edu; Cust-Coach; ghughes@mit.edu;
> glabonte@mit.edu; gsj@mit.edu; jsheytan@mit.edu; khewitt@mit.edu;
> mhankin@mit.edu; rhasselt@MIT.EDU; rjwilk@mit.edu; rrdasari@mit.edu;
> saraf@mit.edu; schedule@mit.edu; serotek@mit.edu; shutdowns@mit.edu;
> heatherg@mit.edu; rjwilk@mit.edu
> Cc: shutdown@plant.mit.edu; C-Zone
> Subject: Bldg. 6 - Water/Drainage Shutdown Request
>
>
The following pure, hot and cold domestic and lab process water as well as
lab waste and sanitary drainage shutdown request for Bldg. 6 on Friday, 3/8
PM to Saturday, 3/9 AM is for your information and comment. Would you
please let me know whether this does or does not meet with your approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 6 - entire building
> Date: 3/8/2002
> Day: Friday
> Time: 7 PM (3/8) - 7 AM (3/9)
> System: Pure, Hot and Cold Domestic, Hot and Cold Lab Process water; Lab
> Waste and Sanitary Drainage;
> Duration: 12 hours
> Reason:
> Temporarily divert lab waste water from Building 6 to 18 into holding
> tank.
>
> Effect:
> Loss of pure water, hot and cold domestic water, hot and cold lab waste
> water and lab waste and sanitary drainage. This means that no toilets,
> bathroom, kitchen and lab sink faucets, emergency showers, equipment
> requiring the use of hot and cold lab process water to operate or lab
> waste and sanitary drainage will be operational during the 12-hour
> shutdown period.
>
>