[53416] in Hotline Meeting
RE: Rescheduling shutdown for building 7 too 1/17
daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Fri Jan 12 14:03:04 2001
Message-Id: <82F0D564C5ADD31180EF00508B556451D2C281@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: arhodes@MIT.EDU, C-Zone <C-Zone@MIT.EDU>, cod@MIT.EDU, ctaylor@MIT.EDU,
Cust-Coach <cust-coach@MIT.EDU>, dineend@MIT.EDU,
engler@mitvma.mit.edu, gayle@MIT.EDU, honda@MIT.EDU, jobrien@MIT.EDU,
kbarrett@MIT.EDU, laugh@MIT.EDU, lordjim@MIT.EDU, mad@MIT.EDU,
mamullow@MIT.EDU, mwsmith@MIT.EDU, ncrosby@MIT.EDU, ndk@MIT.EDU,
pmccosco@MIT.EDU, rberlin@MIT.EDU, sdl-adm-lib@MIT.EDU, sexton@MIT.EDU,
skendall@MIT.EDU, staton@MIT.EDU, vipinternal@MIT.EDU,
schedule@MIT.EDU, shutdowns@MIT.EDU
Cc: shutdown@PLANT.MIT.EDU
Date: Fri, 12 Jan 2001 14:02:44 -0500
Mime-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
CORRECTION: This should read 1/17 not 1/7 I am sorry for the confusion.
Thank you Dawn
>
>
The following shutdown for building 7 is being rescheduled for 1/7 instead
of 1/18. Please let me know if this does or does not meet with your
approval.
Thank you
Dawn Simonelli
Repair and Maintenance
2-1599
> Status: Normal
> Building: 7
> Date: 1/17/01
> Day: Wednesday
> Time: 7:30 am - 3;30 pm
> System: Fire protection water
> Duration: 8 hours
> Reason:
> Move sprinkler heads.
>
> Effect:
> There will be a loss of fire protection water during this time.
>
>