[53329] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Shutdown request for building 18 on 1/11/01

daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Fri Jan 5 12:32:40 2001

Message-Id: <82F0D564C5ADD31180EF00508B556451D2BCE1@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.EDU>, akelsey@MIT.EDU,
        Cust-Coach
	 <cust-coach@MIT.EDU>, mbj@MIT.EDU, rjwilk@MIT.EDU,
        schedule@MIT.EDU, shutdowns@MIT.EDU
Cc: shutdown@plant.mit.edu
Date: Fri, 5 Jan 2001 12:32:32 -0500 
Mime-Version: 1.0
Content-Type: text/plain

> To: 	A-Zone; akelsey@mit.edu; Cust-Coach; mbj@mit.edu; rjwilk@mit.edu;
> schedule@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Shutdown request for building 18 on 1/11/01
> 
> 
The following shutdown request is for building 18 on 1/11/01.  This will be
taking place at the same time as the power shutdown.  Please let me know if
this does or does not meet with your approval.

Thank you
Dawn Simonelli
Repair and Maintenance
2-1599

> Status: Normal
> Building: 18 Entire building
> Date: 1/11/01
> Day: Thursday
> Time: 6 pm - 6 am
> System: All power and lights for the building (except for emergency
> system)
> Duration: 12 hours
> Reason: 
> To replace 13,800 volts feeders and remove first switchboard.
> 
> Effect: 
> There will be a loss of access controls, building power, elevators,
> computers, telephones, and lights.  Also, all chilled water, condenser
> water, pure water, hot & cold domestic, hot & cold lab processed water,
> heating hot water and de-ionized water.  There will also be a loss of
> supply air ventilation, supply air cooling, supply heating air, exhaust
> lab air, exhaust general air, exhaust toilet, compressed control air,
> compressed lab air, lab vacuum air, condensate return steam and exhaust
> hoods.
> 
> 

home help back first fref pref prev next nref lref last post