[51261] in Hotline Meeting
Bldg. 54 - 6/30 - Approved Chilled Water/Heating Hot Water Revise
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jun 28 08:52:31 2000
Message-Id: <82F0D564C5ADD31180EF00508B556451104F90@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'dcarlson@mit.edu'" <dcarlson@MIT.EDU>,
"'cperry@mit.edu'"
<cperry@MIT.EDU>,
"'pbaratta@mit.edu'" <pbaratta@MIT.EDU>,
"'mmahoney@mit.edu'" <mmahoney@MIT.EDU>,
Gerry Hughes
<ghughes@PLANT.MIT.EDU>,
"Larry St. John" <lstjohn@PLANT.MIT.EDU>,
"'politano@mit.edu'" <politano@MIT.EDU>,
David Foster
<dfoster@PLANT.MIT.EDU>, A-Zone <A-Zone@MIT.EDU>,
"'cust-coach@mit.edu'"
<cust-coach@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
"'rm-shutdown@mit.edu'" <rm-shutdown@MIT.EDU>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.EDU>,
"'schedule@mit.edu'" <schedule@MIT.EDU>
Date: Wed, 28 Jun 2000 08:52:18 -0400
Mime-Version: 1.0
Content-Type: text/plain
To: dcarlson@mit.edu; cperry@mit.edu; pbaratta@mit.edu;
mmahoney@mit.edu; Gerry Hughes; Larry St. John; politano@mit.edu; David
Foster; A-Zone; cust-coach@mit.edu
Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; shutdowns@mit.edu;
schedule@mit.edu
Subject: Bldg. 54 - 6/30 - Approved Chilled Water/Heating Hot Water
Revised Shutdown
The following revised approved shutdown for Bldg. 54 on Friday, June 30 is
for your information.
Thank you.
Andrea Nichols
Operations Center
8-7872
Status: Normal
Building: 54
Date: 6/30/00
Day: Friday
Time: 5 AM - 10 AM
System: Pump 4 & pump5 perimeter induction water circulation for boost
cooling or heating depending on system needs
Duration: 5 hours
Reason:
Replacement of control valves for control of temperature of system.
Effect:
Loss of chilled water during shutdown period. Perimeter air flow still
available but temperatures will be higher for loss of extra cooling.