[46733] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Re: Bldg. E40 - 3/31 - Shutdown Request

daemon@ATHENA.MIT.EDU (Jonathon Weiss)
Thu Feb 25 12:28:21 1999

From: Jonathon Weiss <jweiss@MIT.EDU>
To: Andrea Nichols <andrea@PLANT.MIT.EDU>
Cc: shutdowns@MIT.EDU, ops@MIT.EDU, network@MIT.EDU
In-Reply-To: Your message of "Thu, 25 Feb 1999 10:16:18 EST."
             <ECFE33C8A3D4D111917900805FBE00005FCEC6@PLANT.MIT.EDU> 
Date: Thu, 25 Feb 1999 12:28:08 EST


A couple of things:

1) Could you please confirm that this will not affect e40-008, since
it has its own cooling units?

2) Parts of e40, the east have of the 3rd floor, at least, have fairly
constant heat problems because of teh number of workstations in the
area.  I'm a little concerned about waiting until the end of March to
have teh outage.  OTOH, with Boston weather the end of march may be
cooler than the beginning.

	Jonathon



> As a follow-up to the shutdown of 12/23 - the following shutdown request
> for Bldg. E40 - on 3/31 is for your review and comment. Would you please
> let me know whether this does or does not have your approval.
> 
> Thank you.
> 
> Andrea Nichols
> Operations Center
> 8-7872
> 
> > Status: Normal
> > Building: E40
> > Date: 3/31/99
> > Day: Wednesday
> > Time: 8 AM - 4 PM
> > System: Supply ventilation, cooling and heating (Air Handler 1 and
> > Return Fan 1)
> > Duration: 8 hours
> > Reason: 
> > Repairs to fans resulting from maintenance inspection of December,
> > 1998.
> > 
> > Effect: 
> > Loss of supply ventilation, cooling and heating although there will be
> > perimeter heat      (radiators) during the shutdown period.
> > 
> > 