RE: Bldg. E19 (but will affect the air in E18 & E17 also) Shutdo

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue May 5 11:30:20 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'aufiero@mit.edu'" <aufiero@MIT.EDU>,
        "'jean@crc.mit.edu'"
	 <jean@crc.mit.edu>,
        "'rmelo@mit.edu'" <rmelo@MIT.EDU>,
        "'shyoung@mit.edu'" <shyoung@MIT.EDU>,
        "'jmganno@mit.edu'"
	 <jmganno@MIT.EDU>,
        Dan Crovo <DCrovo@PLANT.MIT.EDU>,
        "'mparker@mit.edu'"
	 <mparker@MIT.EDU>,
        "'bethannt@mit.edu'" <bethannt@MIT.EDU>,
        "'goodluck@mit.edu'" <goodluck@MIT.EDU>,
        "'opsnote@mit.edu'"
	 <opsnote@MIT.EDU>,
        "'jfarrell@mit.edu'" <jfarrell@MIT.EDU>,
        "'wbarrett@mit.edu'" <wbarrett@MIT.EDU>,
        "'dlambert@mitvma.mit.edu'"
	 <dlambert@mitvma.mit.edu>,
        "'cashaw@mit.edu'" <cashaw@MIT.EDU>,
        "'dlfair@mit.edu'" <dlfair@MIT.EDU>,
        "'honiker@mit.edu'"
	 <honiker@MIT.EDU>,
        "'kelley@mit.edu'" <kelley@MIT.EDU>,
        "'schedule@mit.edu'" <schedule@MIT.EDU>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.EDU>,
        "'pritch@mit.edu'" <pritch@MIT.EDU>,
        "'cbunker@mit.edu'" <cbunker@MIT.EDU>,
        "'wardd@mit.edu'" <wardd@MIT.EDU>, "'esico@mit.edu'" <esico@MIT.EDU>,
        "'edie@mitvmc.mit.edu'"
	 <edie@mitvmc.mit.edu>
Cc: Shutdown <Shutdown@PLANT.MIT.EDU>
Date: Tue, 5 May 1998 11:26:48 -0400

Dear Everyone:
Unfortunately I omitted the time frame for this shutdown. It is from
11:00 PM on 5/14 to 6:00 AM on 5/15.

Sorry about that.
  Andrea Nichols

> ----------
> The following shutdown request for Bldg. E19 (but will also affect the
> air in E18 and RO/de-ionized water in E17) on 5/14-15 is for your
> information and comment. Woul you please let me know if this has your
> approval or disapproval.
> 
> Note: This shutdown would affect the following floors and Air Handler
> systems:  4th Floor  - Air Handler 4.1 - E19  4th and 5h
> floors; Air Handler 4.2 - E18 4th Floor (CRC); 7th Floor Mechanis
> Equipment Rm. - Air
> Handler 7.1 - (E19 - 6th and 7th Floors; Air Handler 7.2 - E18 - 6th
> Floor; Air Handler 7.3 - E18 6th floor; Heat for E18 4th and 6th
> floors
> will be down as well as RO/de-ionized water for E17 and E18.
> 
> Thank you.
> 
Andrea Nichols
Operations Center
8-7872

>  Status: Normal
> > Building: E19 (but will affect Air for E18 also)
> > Date: 5/14-15/98
> > Day: Thursday
> > Time: 11:00 PM 5/14 - 6:00 AM - 5/15
> > System: All electric normal power & lighting. 
> > Duration: 7 hours
> > Reason: 
> > To install metering equipment on main switchgear. - Note: Emergency
> > power will be on. 6th Floor telephone room will have emergency power
> > on.
> > 
> > Effect: 
> > Loss of Power: access controls, bldg. power, elevators, computers,
> > lighting; Water - chilled water (air conditioning); Air: supply
> > ventilation, supply cooling, supply heating, exhaust laboratory air,
> > exhaust general air, exhaust toilet air and compressed control air;
> > Steam - condensate return only.
> > 
> > 
> 