Approved Shutdown - Buildings 1, 3 and 5-232, 234
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Jul 9 14:04:37 1996
Date: Tue, 9 Jul 1996 14:00 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: opsnote@MIT.EDU, dcarlson@MIT.EDU, cappucci@MIT.EDU, mmahoney@MIT.EDU,
cust-coach@MIT.EDU, schedule@MIT.EDU, shutdowns@MIT.EDU,
wpwohlfa@MIT.EDU, ntomlinson@MIT.EDU, sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, cust-coach@mit.edu, dcarlson@mit.edu,
mmahoney@mit.edu, ntomlinson@mit.edu, opsnote@mit.edu, schedule@mit.edu,
sdverify@mit.edu, shutdowns@mit.edu, wpwohlfa@mit.edu
X-Vms-To:
IN%"opsnote@mit.edu, dcarlson@mit.edu, cappucci@mit.edu, mmahoney@mit.edu, cust
-coach@mit.edu, schedule@mit.edu, shutdowns@mit.edu, wpwohlfa@mit.edu, ntomli
nson@mit.edu, sdverify@mit.edu"
The following approved shutdown is for your review and information.
Thanks very much for your assistance.
Andrea Nichols
Operations Center
Building: 1, 3 and 5-232 and 5-234
System: Electric power and lighting (emergency power WILL be on)
Date: 7/12 - 7/15/96
Day: Friday PM - Monday AM
Time: 5:00 PM (Friday - 5:00 AM (Monday)
Duration: 2 1/2 days
Reason: To replace switchgear in Buildng 1 basement substation.
Effect: Loss of electric power and lighting as follows:
Building 1 - 103A, 115 - 101, 125 to 104B, 131A, 131B,
150A to 190, 153B, 153, 163B, 165A, 153A to 183
All of second floor
All of third floor with the exception of 390 Lecture
Hall
Building 3 - electric room (069) and Utility/Mechanics
Rm. (082)
3-145 to 163, 169, 145 to 165
3-242 to 266, 3-253 to 269
3-352 to 366A, 3-351 to 365
3-432 to 470, 3-431 to 470A
5-232 and 5-234
Note: As requested, power will be on in 1-225 and 1-115A