3 November 2004 Athena UNIX Platform Team Monthly Status Report

daemon@ATHENA.MIT.EDU (William Cattey)
Wed Nov 3 13:47:03 2004

Mime-Version: 1.0 (Apple Message framework v619)
Content-Type: text/plain; charset=US-ASCII; format=flowed
Message-Id: <D80D5370-2DC8-11D9-9565-000393CBAECE@MIT.EDU>
Content-Transfer-Encoding: 7bit
Cc: release-team@MIT.EDU
From: William Cattey <wdc@MIT.EDU>
Date: Wed, 3 Nov 2004 13:47:42 -0500
To: owls@MIT.EDU, ois@MIT.EDU

Team Name: Athena UNIX Platform Team
Team Leader: Bill Cattey
Report Date: 3 November 2004

Submitted by: Bill Cattey

Team URL: http://web.mit.edu/teamhtml/Athena/
Release URL: http://web.mit.edu/release/www/

Accomplishments past period:

ONGOING: Testing and bug fixing of Athena 9.3.

Last Month's goals:

PROGRESS: Review, revise and publish document, "Differences between 
Athena
Linux and stock Red Hat Linux".
DELAYED: Develop Disconnected Athena documentation.
DELAYED: For Athena disconnected operation, craft fixes for issues 
raised in testing and retest.
PROGRESS: Produce new Athena installer with better SCSI support.
DELAYED: Produce mkserv SAMBA so that Athena systems can be SAMBA 
servers.
DELAYED: Improve Linux Athena installer documentation.
PROGRESS: Finish integration of GNOME 2.8 into upcoming major release.
DELAYED: Publish revised email documentation containing pine tutorial 
from old Athena minicourse.

Community Milestones Met:

Other Accomplishments:

* Wrote document comparing RHN and Athena update. TODO: Find the best 
place to publish it.
* Did all the work to produce the patch release, deployed it to the dev 
cell for testing.  Target general deploy for 8 November.
* Created GForge project for Athena release 
(http://gforge.mit.edu/projects/athena/).  Began populating it with 
work items.
* Worked with ACIS team on getting Athena happy on non-standard 
configurations in classrooms.
* Experimented with converting Athena CVS source repository to 
subversion, with an eye to possible future migration.

Next month's goals:

ONGOING: Testing and bug fixing of current Athena release.

OLD: Review, revise and publish document, "Differences between Athena
Linux and stock Red Hat Linux".
OLD: Develop Disconnected Athena documentation.
CHANGED: For Athena disconnected operation, craft fixes for issues 
raised in testing and retest.
OLD: Produce new Athena installer with better SCSI support.
OLD: Produce mkserv SAMBA so that Athena systems can be SAMBA servers.
OLD: Improve Linux Athena installer documentation.
OLD: Finish integration of GNOME 2.8 into upcoming major release.
OLD: Publish revised email documentation containing pine tutorial from 
old Athena minicourse.
NEW: Finish populating Athena GForge project with tasks.
NEW: Develop strategy for migrating Athena bug reports from discuss to 
GForge.
NEW: Integrate Solaris kernel patch for future 9.3 patch release.

Next Community Milestone(s):

Patch release, target before Drop Date, containing:
	Mozilla security patch.
	Relevant updates from Red Hat Enterprise 3 Update 3, mostly security 
patches and hardware compatibility enhancements.
	Add java software development kit on Linux to local disk.

Bugfix patch release when next needed.

Issues:

Key learnings:

Additional comments:

Athena Monthly machine counts:

Method: On install, machines get a unique ID. Each day every system
reports its existence to a central syslog.  This method over-counts
systems installed multiple times. Systems running Athena than 9.0 or
earlier are not counted.

SYSTYPE  6/2004  7/2004  8/2004  9/2004  10/2004 Delta
LINUX    742      726      717      790      736      -54
SUN      681      706      716      674      659      -15