Along with other topics of conversation, dot and mhbraun proposed that
the release schedule be:
June 28 -- test
July 25 -- Release
The proposal provides time for Release Engineering to complete work on
the source tree and production of packs, work to coordinate the test
release with cluster maintainers, and checking whether mkserv is
prepared for a new release.
Documentation (poster, handouts, etc.) should be prepared.
A new version of mtools that works with or without vold on Suns has
been prepared and will be put into the consulting locker. This will
allow vold to be run (as required for some new software, such as MAE).