5ESS upgrade and replacement Project

daemon@ATHENA.MIT.EDU (Joan Cyr)
Fri Nov 8 09:55:02 2002

Message-Id: <5.1.0.14.2.20021104155511.03920eb8@hesiod>
Date: Fri, 08 Nov 2002 09:55:49 -0500
To: delivery@mit.edu
From: Joan Cyr <jcyr@MIT.EDU>
Mime-Version: 1.0
Content-Type: multipart/alternative;
	boundary="=====================_5570009==_.ALT"

--=====================_5570009==_.ALT
Content-Type: text/plain; charset="us-ascii"; format=flowed

Project Name: 5ESS upgrade and replacement
Project Leader: Lu Keohane
Report Date November 8, 2002
Submitted by: Lu Keohane/Joan Cyr
Project Notebook URL: http://web.mit.edu/is/delivery/5ess/

Accomplishments in October 2002:
Lucent completed working on the lists of anomalies identified in the 
walk-through (e.g. alarms are all now working correctly; test and monitor 
phones have been installed and are functioning normally, etc.);

Continued to update ICE9 database with information gathered as a result of 
the Frame Verification (57,000 cable pairs terminating within the 3 
switchrooms; this will continue beyond the end of this Delivery project;

Began the reconstruction of the NW12 switchroom; returned the borrowed 
space to Nuclear Engineering group;

Continued negotiations around final payments for Lucent Integration travel 
and living expenses, and transportation costs;
Next Month's plan:

Revisit the redesign and construction plans for the E19's switchroom, (e.g. 
this includes the surrounding offices and equipment that had been moved 
prior to the start of this project.  This will include the addition of 4 
new staff members and possibly 4 new contracted members).  This redesign 
process will occur in conjunction with Christine Cavanna (I/S Space 
Planning) and encompass all TNS staff in E19.

Begin the planning process for the training for the Operations team and 
technician.  (e.g. 5E architecture, maintenance, translations, DDM 2000 and 
other newly installed equipment).

Issues:

Having to keep Lucent abreast of all outstanding items on the list created 
during the project and especially during the walk through.   Had to direct 
them as to how the talk and monitor phones should work, and escalating the 
process up Lucent's technical hierarchy;


Key Learnings:

In the month of October, we learned about this great time-out in the middle 
of the day called the lunch hour.  It's when you stop working at noon-ish 
and eat food in a civilized manner.  A truly wonderful discovery after a 
very long 4 year process called the 5ESS Upgrade and Replacement 
Project.      ;o)


Joni  :o) 
--=====================_5570009==_.ALT
Content-Type: text/html; charset="us-ascii"

<html>
Project Name: 5ESS upgrade and replacement<br>
Project Leader: Lu Keohane<br>
Report Date November 8, 2002<br>
Submitted by: Lu Keohane/Joan
Cyr<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<font size=2>Project Notebook URL:
</font><a href="http://web.mit.edu/is/delivery/5ess/" eudora="autourl"><font size=2 color="#0000FF"><u>h</a></font><a href="http://web.mit.edu/is/delivery/5ess/" eudora="autourl"><font face="Arial Narrow, Helvetica" color="#0000FF">ttp://web.mit.edu/is/delivery/5ess/</a><br><br>
</font><b>Accomplishments in October 2002:</u></b> 
<dl>
<dd>Lucent completed working on the lists of anomalies identified in the
walk-through (e.g. alarms are all now working correctly; test and monitor
phones have been installed and are functioning normally, etc.);<br><br>

<dd>Continued to update ICE9 database with information gathered as a
result of the Frame Verification (57,000 cable pairs terminating within
the 3 switchrooms; this will continue beyond the end of this Delivery
project;<br><br>

<dd>Began the reconstruction of the NW12 switchroom; returned the
borrowed space to Nuclear Engineering group;<br><br>

<dd>Continued negotiations around final payments for Lucent Integration
travel and living expenses, and transportation costs; 
</dl><b><u>Next Month’s plan:<br><br>
</u></b>Revisit the redesign and construction plans for the E19’s
switchroom, (e.g. this includes the surrounding offices and equipment
that had been moved prior to the start of this project.&nbsp; This will
include the addition of 4 new staff members and possibly 4 new contracted
members).&nbsp; This redesign process will occur in conjunction with
Christine Cavanna (I/S Space Planning) and encompass all TNS staff in
E19.<br><br>
Begin the planning process for the training for the Operations team and
technician.&nbsp; (e.g. 5E architecture, maintenance, translations, DDM
2000 and other newly installed equipment).<br><br>
<b><u>Issues:<br><br>
</u></b><font size=2>Having to keep Lucent abreast of all outstanding
items on the list created during the project and especially during the
walk through.&nbsp;&nbsp; Had to direct them as to how the talk and
monitor phones should work, and escalating the process up Lucent's
technical hierarchy;<br><br>
<br>
</font><b><u>Key Learnings:</u></b> <br><br>
In the month of October, we learned about this great time-out in the
middle of the day called the lunch hour.&nbsp; It's when you stop working
at noon-ish and eat food in a civilized manner.&nbsp; A truly wonderful
discovery after a very long 4 year process called the 5ESS Upgrade and
Replacement Project.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ;o)<br>
<br>
<br>
Joni&nbsp; :o)