4 June 2003 Athena UNIX Platform Team Monthly Status Report

daemon@ATHENA.MIT.EDU (William Cattey)
Wed Jun 4 13:55:04 2003

Date: Wed, 4 Jun 2003 13:54:17 -0400
Content-Type: text/plain; charset=ISO-8859-1; format=flowed
Mime-Version: 1.0 (Apple Message framework v552)
Cc: release-team@mit.edu
To: delivery@mit.edu, owls@mit.edu
From: William Cattey <wdc@MIT.EDU>
Message-Id: <9001CBB4-96B5-11D7-AE8A-000A957B2E52@mit.edu>
Content-Transfer-Encoding: 8bit

Team Name: Athena UNIX Platform Team
       Team Leader: Bill Cattey
  Report Date: 4 June 2003

Submitted by: Bill Cattey

       Team URL:      http://web.mit.edu/teamhtml/Athena/
       Release URL:   http://web.mit.edu/release/www/

Accomplishments past period:

Last Month's goals:

Ongoing: Bug fixing of Athena 9.1 if necessary. -- None was necesary.
Focus shifts to Athena 9.2.

DELAYED: Produce document, "Differences between Athena Linux and stock 
Red
     Hat Linux".
DELAYED: Develop fast DNS timeout for disconnected operation.
DELAYED: Develop friendly way to go on/off net or switch interfaces.
DELAYED: Develop Disconnected Athena documentation.
CHANGED: Investigate workaround for VMWare problem. -- Bill is going to 
make sure we can close this issue.

DONE: Deploy Beta release of Athena 9.2.
PROGRESS: Prepare Early release of Athena 9.2
PROGRESS: Evaluate laptop hardware for Athena recommendations.
PROGRESS: Evaluate desktop hardware for Athena recommendations if any
arrives from IBM or HP. -- HP officially withdrew from this year's 
desktop buy, but has a Linux laptop they want to show us.

Community Milestone Met:

Athena Beta released on time -- May 15.

Other Accomplishments:

* Made MathML fonts available in Mozilla for Athena 9.2 release at the 
request of the Faculty Liaisons.
* Wrote system release notes.
* Fixed bugs in cyrus IMAP perl interface.
* Fixed bugs in sawfish window manager.
* Fixed Linux installer bug that caused problems when populating the 
/dev directory.
* Bill prepared a talk for the IBM ThinkTank conference on Athena and 
Linux Laptops.
* Investigated hiring contractor to break log jam on delayed 
disconnected operation work.

Next month's goals:

Ongoing: Testing and bug fixing of Athena 9.2.

NEW: Prepare user release notes for Athena 9.2
NEW: Deploy Early release of Athena 9.2
NEW: Develop 9.2-based Solaris miniroot.
NEW: Develop RedHat 9-based Linux miniroot.
NEW: Develop Athena 9.2 knfs port.

CHANGED: Investigate quitting worrying about workaround for VMWare 
problem.

OLD: Evaluate laptop hardware for Athena recommendations.
OLD: Evaluate desktop hardware for Athena recommendations if any
arrives from IBM or HP.
OLD: Produce document, "Differences between Athena Linux and stock Red
     Hat Linux".
OLD: Develop fast DNS timeout for disconnected operation.
OLD: Develop friendly way to go on/off net or switch interfaces.
OLD: Develop Disconnected Athena documentation.

Next Community Milestone(s):

Athena Early release targeted for June 16.

Issues:

GNOME has shifted to prefer the previously unknown metacity window 
manager.  Shifting the Athena default window manager to metacity 
involves some work to craft appropriate configurations, and may involve 
some user disruption.  We elected to put off this work and disruption.

Key learnings:

Additional comments:

Athena Monthly machine counts:

Summary: About the same as last month.

New method:  Have systems get themselves a unique id every time they
install, and report every day they are up.  This over-counts systems
installed multiple times, and under-counts systems that predate Athena
9.1.


May        April        March		Delta

756 linux  753 linux    744 linux	+3
  61 sgi    64 sgi       65 sgi		-3
786 sun    824 sun4     799 sun4 	-38

Old method:  Count unique host names seen rebooting.  To remedy
under-count systems that don't reboot, we sum over a six months.  That
over-counts systems that were re-purposed to non-athena use.


Summary:
890 Solaris down 19
955 Linux down 45

Eventually the two counts should converge on the same value, but it's
still a noisy count with 10-20% error.

Here are the number of reboots we saw:

Solaris:
Month:  Dec    Jan    Feb    Mar    Apr    May
This:   467    746    444    751    495    731
Sum:    1035   1007   958    914    909    890

Linux:
Month:  Dec    Jan    Feb    Mar    Apr    May
This:   374    461    410    459    439    326
Sum:    1219   1193   1137   1064  1000    955