[278] in peace2
ACTION ALERT! Tuesday May 23 - Barrage Ogden Day No. 2 (fwd)
daemon@ATHENA.MIT.EDU (Vinay Kumar - matching athena acco)
Tue May 23 00:06:32 2000
From: Vinay Kumar - matching athena account <vkumar@ai.mit.edu>
Message-Id: <10005230402.AA08820@massa-intermedia.mit.edu>
To: secular@MIT.EDU, peace-list@MIT.EDU
Date: Tue, 23 May 100 00:02:58 -0400 (EDT)
Mime-Version: 1.0
Content-Type: text/plain; charset=US-ASCII
Content-Transfer-Encoding: 7bit
Dear Friends,
Thank you for participating in last month's Barrage Ogden Day. This is
the second one in the effort to keep up the pressure on Ogden Corporation
to withdraw from the Maheshwar Dam. This time there is a need for even
greater participation in order to let Ogden know that we will not take
its claims on face value.
The section below on "Ogden's Claims and Some Rebuttals" is based on the
response that we received from Ogden after last month's barrage. You may
choose to use the facts presented in that section while drafting your letter
or making your call.
Please forward to whoever might be able to help out.
Thanks,
vinay
Forwarded message:
> From venu@narmada.org Mon May 22 17:09 EDT 2000
> Date: Mon, 22 May 2000 13:51:32 -0700 (PDT)
>
>
> **Please distribute!**
> ACTION ALERT!
> STOP NY-BASED OGDEN CORP. FROM BUILDING DAMS ON INDIA'S NARMADA RIVER!
>
> BARRAGE OGDEN DAY - NUMBER 2
> TUESDAY, MAY 23
>
> Thank you for participating in last month's Barrage Ogden Day to stop
> the Maheshwar Dam! Because of your actions, we generated about 1500
> faxes, calls and emails to Ogden! But, we still need your help. We
> urge you to join us in Barrage Ogden Day #2 and CALL, FAX OR EMAIL
> OGDEN ON MAY 23. We need to let Ogden know that we won't be satisfied
> until the company has withdrawn from the destructive Maheshwar Dam.
>
> Below is a sample letter, background on the dam and some rebuttals
> you can use to counter Ogden's claims.
>
> On March 23, NY-based Ogden Corporation signed a Memorandum of Intent
> to take a 49% equity share in the controversial Maheshwar Dam on
> India's Narmada River. The project would be a social and economic
> disaster. Around 40,000 people would lose their lands or livelihoods
> because of the project. Independent surveys have shown that there is
> no available land to give to people whose lands will be flooded. Due
> to the project's poor economics and massive opposition, including
> countless demonstrations and rallies, two German utilities and one
> American company withdrew from the project during the last two years.
>
> We urge you to CONTACT OGDEN ON MAY 23 and tell them to withdraw from
> the Maheshwar Dam. If we act together, we can stop this social and
> economic disaster.
>
> Thanks for your support!
> Susanne Wong
>
> -------------------------- --------------------------
> CALL! FAX! EMAIL!
> TELL OGDEN OFFICIALS TO GET OUT OF THE MAHESHWAR DAM!
> TUESDAY, MAY 23
>
> Scott Mackin
> President and CEO
> Ogden Corp.
> Tel: 212-868-6000
> Fax: 212-868-5714
> Email: scott_mackin@ogden.com
>
> Kent Burton
> VP, Policy and Communications
> Ogden Corp.
> Tel: 703-246-0833
> Fax: 703-246-0808
> Email: kent_burton@ogden-energy.com
>
> --------------------------
> SAMPLE LETTER
> --------------------------
>
> Dear Mr. Burton or Mr. Mackin,
>
> I am writing to urge you to withdraw from the Maheshwar Dam in India.
> This project is a social and economic disaster and will destroy the
> lands and livelihoods of 40,000 people living in the Narmada Valley.
>
> Despite assertions by your company, no land is available to give to
> people whose lands will be flooded. A 1998 report by India's premier
> social research institute, the Tata Institute of Social Sciences,
> found that government lands claimed to be available for resettlement
> were either eroded and stony, already used by other poverty-stricken
> communities, or located in the submergence zone of the reservoir. The
> report also found that claims of private lands identified for
> resettlement were fictitious.
>
> Investment in the Maheshwar Dam poses serious political and financial
> risks. The Madhya Pradesh Electricity Board, which is supposed to
> purchase power from the project, is bankrupt and is likely to default
> on its payments. The affected people, led by the Narmada Bachao
> Andolan, are determined that they will never let the project be built.
>
> I urge you to respect the demands of the people affected by the
> Maheshwar Dam and withdraw from this destructive and uneconomic
> project.
>
> Sincerely,
>
>
> --------------------------
> BACKGROUND
> --------------------------
>
> The Maheshwar Dam in Madhya Pradesh state in central India would
> affect around 40,000 farmers, wage laborers, fishers and crafts
> people in 61 villages and submerge about 1,100 hectares of rich
> agricultural land. Many of these people would lose part or all of
> their lands, others such as those who quarry river bed gravel, do not
> own land but would lose the source of their livelihood.
>
> The affected people, led by the Narmada Bachao Andolan which has
> campaigned for more than a decade to stop dams on the Narmada River,
> are determined that they will never let the project be built. Over
> the last two years, thousands of farmers whose lives and livelihoods
> will be destroyed by the Maheshwar Dam have occupied the dam site ten
> times, barricaded all roads leading to the dam for three months, and
> held mass demonstrations and hunger strikes opposing the dam.
>
> Electricity generated by the dam is projected to cost four to five
> times more than current electricity produced by Madhya Pradesh state.
> The Madhya Pradesh Electricity Board, which is supposed to purchase
> power from the project, is on the verge of bankruptcy and is likely
> to default on its payments. Due to the project's serious financial
> risks and intense opposition from local people and Indian and
> international environmental and human rights groups, U.S. power
> utility PacifiCorp backed out of the project in 1998, and German
> utilities Bayernwerk and VEW Energie pulled out in April 1999.
>
> -------------------------------------------
> OGDEN'S CLAIMS AND SOME REBUTTALS
> -------------------------------------------
>
> Ogden's Claim: Families affected by the dam will be compensated for
> their homes and land. Land is available for resettlement.
>
> RESPONSE: A 1998 report by India's premier social research institute,
> the Tata Institute of Social Sciences, found that government lands
> claimed to be available for resettlement were either eroded and stony
> and already used by other poverty-stricken communities, or located in
> the submergence zone of the reservoir. The report also found that
> claims of private lands identified for resettlement were fictitious.
>
> The legal framework governing resettlement in MP clearly stipulates
> that land lost to submergence must be compensated by grants of new
> lands. As of today, project authorities have not made a single person
> an offer of cultivable land. Instead, project authorities have tried
> to intimidate people to accept cash compensation by not offering them
> any land and committing various illegal acts like dumping stone on
> people's land and seizing lands arbitrarily.
>
> Ogden's Claim: The new resettlement villages will have new roads,
> schools, medical, sanitation and drinking water facilities and
> households will have electrical connections.
>
> RESPONSE: No new villages have been built with the amenities claimed
> by Ogden. Many villagers have refused to move to two of the
> resettlement villages, Samraj and Jalud, because of the barren lands
> and small house plots there. Meanwhile, construction of the dam will
> destroy the rich economy in the valley and flood existing
> agricultural fields, schools, roads and other infrastructure. The
> German NGO Urgewald states in their report on Maheshwar (1999) that
> "if compensation at replacement value [of homes, lands, existing
> infrastructure and sources of livelihood] would be undertaken, the
> project would very likely not be economically viable."
>
> Ogden's Claim: Local people support the Maheshwar Dam and are
> encouraging us to finish as soon as possible.
>
> RESPONSE: The affected people state that they are "prepared to wage a
> relentless struggle" against the Maheshwar Dam and are determined to
> "not let the dam be built at any cost." The Narmada Bachao Andolan
> (NBA - Save the Narmada Movement) has been leading the fight against
> dam construction on the Narmada River for more than a decade and
> represents tens of thousands of local people. This spring, nearly 300
> elected representatives of the affected area sent Ogden a resolution
> opposing the project.
>
> Over the last two years, thousands of people affected by the dam have
> occupied the construction site ten times and held mass demonstrations
> and hunger strikes opposing the project. In spring 1998, protesters
> barricaded roads leading to the dam site for 3 months and blocked the
> flow of construction material to the site.
>
> On February 24, 2000, villagers launched an indefinite protest in
> front of the dam site demanding authorities to demonstrate the
> utility of the project and available lands for resettlement. On March
> 8, police beat and arrested the protesters. On April 4, 200 project
> affected people demonstrated outside the US Embassy in Delhi opposing
> Ogden's involvement in the Maheshwar Dam.
>
> Ogden's Claim: The number of people who would be displaced by the dam
> has been overestimated.
>
> RESPONSE: Recent surveys by the NBA suggest that about 35-40,000
> people will be affected by the project (this figure also includes
> landless people who will lose their livelihoods). Independent reviews
> show that the official figures, which range from 2,264 to 4,000
> families, are gross underestimates and based on outdated and
> incomplete data. The official figures also exclude thousands of
> people who would lose their livelihoods to the project (including
> landless labourers, fisherpeople, and those dependent on riverbed
> gravel quarrying).
>
> Ogden's Claim: The 400 megawatts generated at Maheshwar will supply
> the state with peaking power to meet demand that cannot be handled by
> existing facilities.
>
> RESPONSE: The project will generate far less power than appears.
> According to project data, the average firm power expected to be
> generated by Maheshwar is 92 MW initially and 49 MW finally. Because
> the project has only a small water storage capacity its power
> production depends on the amount of water flowing in the river at a
> particular time. Nearly 80% of the project's energy generation will
> occur in the four monsoon months when river flow is high, but when
> there is an existing surplus of power. Generation at Maheshwar is
> supposed to rely on water released from a massive storage reservoir
> upstream (the Narmada Sagar Project). This project is long delayed
> and unlikely to ever be completed, and this will thus reduce the
> amount of power expected to be produced at Maheshwar.
>
> Independent energy analysts who participated in a Task Force on the
> Maheshwar project sponsored by the Madhya Pradesh (MP) government
> estimate that its power will cost around four times the cost of power
> currently produced in MP and will be among the most expensive in the
> country. Project authorities have denied these allegations but
> refused to provide their own detailed estimates of power costs.
>
> There are cheaper and more effective alternatives. The Task Force
> also recommended that work on the Maheshwar dam be halted and a fresh
> analysis of costs and benefits undertaken to establish the viability
> of the project. It suggested various alternatives including
> demand-management measures, biomass generation, optimum use of
> oil-based plants and existing dams, and micro-hydro plants. In March
> 1999, the Central Power Minister, Mr. Kumaramangalam, made an offer
> of significantly cheaper power to the state of Madhya Pradesh from
> the Cepa project in Orissa.
>
> Ogden's Claim: This project will provide people with an important new
> source of clean energy.
>
> RESPONSE: The energy from Maheshwar Dam will not be "clean." Dams
> block fish migration and alter the natural pattern of floods and
> sediment flows. Because dams trap a river's flow, dams foul river
> water in numerous ways, affecting its chemistry, temperature, and
> turbidity (sediment load). These hydrological, chemical and physical
> changes have serious impacts on riverine and floodplain flora and
> fauna which are adapted to the natural characteristics of the river.
> The specific environmental impacts of the Maheshwar project are not
> known because no comprehensive environmental assessment exists. This
> is a violation of both Indian and international standards for dam
> projects.
>
> FOR MORE INFORMATION:
> Go to www.narmada.org or www.irn.org
> International Rivers Network
> 1847 Berkeley Way, Berkeley, CA 94703 USA
> tel: 510-848-1155 fax: 510-848-1008 email: swong@irn.org
>