[890] in I/T Delivery

home help back first fref pref prev next nref lref last post

5ESS upgrade and replacement Project

daemon@ATHENA.MIT.EDU (Louise T. Keohane)
Tue Oct 1 13:59:42 2002

Message-Id: <5.1.0.14.2.20021001134908.00a15da0@hesiod>
Date: Tue, 01 Oct 2002 13:52:04 -0400
To: delivery@mit.edu
From: "Louise T. Keohane" <lu@MIT.EDU>
Mime-Version: 1.0
Content-Type: multipart/alternative;
	boundary="=====================_2980683==_.ALT"

--=====================_2980683==_.ALT
Content-Type: text/plain; charset="iso-8859-1"; format=flowed
Content-Transfer-Encoding: quoted-printable

Project Name: 5ESS upgrade and replacement
Project Leader: Lu Keohane
Report Date May 6, 2002
Submitted by: Lu Keohane
Project Notebook URL:  http://web.mit.edu/is/delivery/5ess/

Accomplishments in September 2002:
Cable lengths were modified in the E19 switchroom.  Some cables were=20
operating on critical pieces of hardware and had to be done off hours and=20
with great attention to detail.

MIT and Lucent completed a walk through of all three switch sites carefully=
=20
documenting any anomalies.  The acceptance plan will be signed when all=20
changes are completed.

Modifications to the DDM-2000 has been completed and tested in all three=
 sites.

The acceptance plan was signed with the stipulation that the list from the=
=20
walk through must be completed before payment will be released.

The NW12 switchroom is currently under construction (returning borrowed=20
space to the Nuclear Science folks).  Our expected completion is no later=20
than October 11, 2002.

Modified alarms for the remote monitoring systems which is maintained by=20
Lucent=92s  Network Reliability Center in Denver.

Approximately a dozen software releases were installed on the new 5ESS.

Telephone exchanges were added to the 5ESS-2000 to provide services to the=
=20
new dorms that came on line.

ICE 9 continues to be updated to include the changes required when working=
=20
with the new 5ESS database (this includes the Cable and Pair modifications=
=20
that have been inventoried during this project).

Next Month=92s plan:

         Revisit the redesign and construction plans for the E19=92s=20
switchroom, (e.g. this includes the surrounding offices and equipment that=
=20
had been moved prior to the start of this project.  This will include the=20
addition of 4 new staff members and possibly 4 new contracted=20
members).  This redesign process will occur in conjunction with Christine=20
Cavanna (I/S Space Planning) and encompass all TNS staff in E19.

         Continue to explore strategies related to the 5ESS, Voice Mail,=20
ACD, ICE 9, VOIP, IVR and other applications.

         Begin the planning process for the training for the Operations=20
team and technician.  (e.g. 5E architecture, maintenance, translations, DDM=
=20
2000 and other newly installed equipment).

         Provide training to the 5E Support and Operator Services=92 team.


Issues:

         Having to keep Lucent abreast of all outstanding items on the list=
=20
created during the project and especially during the walk through.


Key Learnings:

         Lucent has recently acknowledged the significance of MIT=92s=20
foresight into modifying some of the 5E configuration before the equipment=
=20
was delivered.  We strongly influenced changes at no cost to MIT on many=20
items before our equipment left the factory floor.  Therefore, we=20
positioned the new 5ESS-2000 in a ready state for new and upcoming=
 technology.





Thanks,

Lu

   =BA=BF=BA
    ~
--=====================_2980683==_.ALT
Content-Type: text/html; charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<html>
Project Name: 5ESS upgrade and replacement<br>
Project Leader: Lu Keohane<br>
Report Date May 6, 2002<br>
Submitted by: Lu
Keohane<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<font size=3D2>Project Notebook URL: </font><font size=3D2 color=3D"#0000FF"=
>
<a href=3D"http://web.mit.edu/is/delivery/5ess/"=
 eudora=3D"autourl"><u>h</a></font><font face=3D"Arial Narrow, Helvetica"=
 color=3D"#0000FF">ttp<a href=3D"http://web.mit.edu/is/delivery/5ess/"=
 eudora=3D"autourl">://web.mit.edu/is/delivery/5ess/<br><br>
</a></font><b>Accomplishments in September 2002:</u></b> <br>

<dl>
<dd>Cable lengths were modified in the E19 switchroom.&nbsp; Some cables=
 were operating on critical pieces of hardware and had to be done off hours=
 and with great attention to detail.<br><br>

<dd>MIT and Lucent completed a walk through of all three switch sites=
 carefully documenting any anomalies.&nbsp; The acceptance plan will be=
 signed when all changes are completed.<br><br>

<dd>Modifications to the DDM-2000 has been completed and tested in all three=
 sites.<br><br>

<dd>The acceptance plan was signed with the stipulation that the list from=
 the walk through must be completed before payment will be released.&nbsp;=
 <br><br>

<dd>The NW12 switchroom is currently under construction (returning borrowed=
 space to the Nuclear Science folks).&nbsp; Our expected completion is no=
 later than October 11, 2002.<br><br>

<dd>Modified alarms for the remote monitoring systems which is maintained by=
 Lucent=92s&nbsp; Network Reliability Center in Denver.<br><br>

<dd>Approximately a dozen software releases were installed on the new=
 5ESS.&nbsp;&nbsp;&nbsp; <br><br>

<dd>Telephone exchanges were added to the 5ESS-2000 to provide services to=
 the new dorms that came on line.<br><br>

<dd>ICE 9 continues to be updated to include the changes required when=
 working with the new 5ESS database (this includes the Cable and Pair=
 modifications that have been inventoried during this project).<br><br>

</dl><b><u>Next Month=92s plan:<br><br>
</u></b><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Revis=
it the redesign and construction plans for the E19=92s switchroom, (e.g.=
 this includes the surrounding offices and equipment that had been moved=
 prior to the start of this project.&nbsp; This will include the addition of=
 4 new staff members and possibly 4 new contracted members).&nbsp; This=
 redesign process will occur in conjunction with Christine Cavanna (I/S=
 Space Planning) and encompass all TNS staff in E19.<br><br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Continue to=
 explore strategies related to the 5ESS, Voice Mail, ACD, ICE 9, VOIP, IVR=
 and other applications.<br><br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Begin the=
 planning process for the training for the Operations team and=
 technician.&nbsp; (e.g. 5E architecture, maintenance, translations, DDM=
 2000 and other newly installed equipment).<br><br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Provide=
 training to the 5E Support and Operator Services=92 team. <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<b><u>Issues:<br><br>
</u></b><font=
 size=3D2><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Hav=
ing to keep Lucent abreast of all outstanding items on the list created=
 during the project and especially during the walk through.<br><br>
<br>
</font><b><u>Key Learnings:</u></b> <br><br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Lucent has=
 recently acknowledged the significance of MIT=92s foresight into modifying=
 some of the 5E configuration before the equipment was delivered.&nbsp; We=
 strongly influenced changes at no cost to MIT on many items before our=
 equipment left the factory floor.&nbsp; Therefore, we positioned the new=
 5ESS-2000 in a ready state for new and upcoming technology.<br><br>
<br><br>
<br>
<x-sigsep><p></x-sigsep>
Thanks,<br><br>
Lu<br><br>
&nbsp; <font color=3D"#0000FF">=BA</font><font color=3D"#800080">=BF</font><=
font color=3D"#0000FF">=BA<br>
</font>&nbsp;&nbsp; <font color=3D"#FF0000">~</font></html>

--=====================_2980683==_.ALT--


home help back first fref pref prev next nref lref last post