[1000] in I/T Delivery
TSM to UNIX migration - January status report
daemon@ATHENA.MIT.EDU (David G Kalenderian)
Fri Jan 10 14:26:30 2003
Date: Fri, 10 Jan 03 14:21:07 EST
From: David G Kalenderian <DAVEK@MITVMA.MIT.EDU>
To: DELIVERY@MIT.EDU
Message-Id: <030110.142621.EST.DAVEK@MITVMA.MIT.EDU>
MIME-Version: 1.0
Content-Type: TEXT/PLAIN; charset=US-ASCII
Content-Transfer-Encoding: 7BIT
Project Name: TSM Migration to UNIX Delivery
Project Leader: Dave Kalenderian
Report Date: 01/10/03
Submitted by: David Kalenderian
URL: http://web.mit.edu/is/delivery/tsm-unix/index.html
Accomplishments past period:
----------------------------
- ESCON adapters for mainframe connectivity installed in IBM ESS.
- Sun servers and SAN switches installed.
- Reviewed details and scheduled phase one of 3494 ATL upgrade with
IBM.
- Met with IBM reps and completed IBM ESS System Assurance.
- Refined TSM Migration Support Plan. Created draft of TSM User
migration notice.
- Met with Pioneer reps to discuss next steps in the SAN design and
implementation. Scheduled a followup session to discuss details of
the SAN design and configuration of the IBM ESS.
Milestones completed
---------------------
- SAN hardware (IBM ESS and switches) installed
Ongoing issues:
--------------
- Need to decide on policy for unreachable TSM subscribers during user
migration periods.
- Who will deal with customer followup issues during user migration?
Help Desk does not have enough EFT to do this.
Goals for next month:
---------------------
- Install and configure OS on all TSM SUN servers.
- Complete Phase 1 of 3494 tape library upgrade. Includes conversion of
3590 drive to fiber attach, drive relocation, frame modification and cation
network connectivity.
- Connect and configure VM mainframe storage on ESS.
- Finalize SAN design and implement SAN configuration. Participate in
SAN skills transfer with IBM Business Partner.
- Finalize TSM user migration plan, TSM user migration notice.
Additional comments:
- Sun Server rack mount kits for V480's seem flimsy. May need to get SUN
reps in to inspect.