Miki handed out an outline and an example initial bit of the ABS
Reference manual. We liked the content, and talked about some of the
issues of typeographic presentation. Miki figures 2 or 3 weeks before
the document is fleshed out.
Tomorrow Vrt will write up the checklist of what has and has not been
tested. The good news is that the coverage is better than we expected.
About 50 percent of the system was unit tested (30% of the master) and
for those units tested, the coverage is about 90%.
Diane made an attempt to run Purify on the master, but got discouraged
by it's attempt to run over EVERYTHING, and over the long time it took.
The large cell test is IN PROGRESS. So far no complaints.
Ted will supply info on the performance of the existing Transarc backup
as a baseline to make sure our performance is ok.