[707] in sapr3-soft
Defaulting Valuation Type for Backflushed Component Materials
daemon@ATHENA.MIT.EDU (DuPont)
Mon Dec 22 10:47:27 1997
To: sapr3-soft@MIT.EDU
Date: 22 Dec 1997 07:37:24 -0600
From: DuPont <clarkjw@csoc-a1.email.dupont.com> (by way of SAP Moderator <sap-request@realtimeusa.com>)
Under 3.1H, is there a way to default the Valuation Type of materials being
consumed as defined in the BOM? We are using Repetitive Manufacturing with
Run Schedule Quantities and set up our finished and component materials
Valuation Type managed but not Batch Controlled. When backflushing
production via transaction MF43, the system can be set up to default in the
Valuation Type of the produced finished material, but apparently not for
the component materials being consumed.
----------------------------------------------------
comp.soft-sys.business.sap is a moderated newsgroup.
Postings are archived and available from the
Realtime USA web site at http://www.realtimeusa.com
----------------------------------------------------