[263] in sapr3-soft
Basis:ACCT:Cost Component HELP
daemon@ATHENA.MIT.EDU (razaks@aol.com (RazakS) (by way of)
Sat Jun 21 10:47:19 1997
To: sapr3-soft@MIT.EDU
Date: 21 Jun 1997 10:02:21 -0400
From: razaks@aol.com (RazakS) (by way of SAP Moderator <razaks@aol.com>)
I need to write a BDC to the initial load of the material cost, burden,
overhead for single level or multi-level BOM and material that are
currently in our SAP 2.2G system. Currently we have only standard cost.
Could any one help me with the transaction, that needed to be used?
Many Thanks
----------------------------------------------------
comp.soft-sys.business.sap is a moderated newsgroup.
Postings are archived and available from the
Realtime USA web site at http://www.realtimeusa.com
----------------------------------------------------