[9919] in Hotline Meeting
Re: Big electrical shutdown (More Info)
daemon@ATHENA.MIT.EDU (Jeffrey I. Schiller)
Wed Jul 29 12:34:29 1992
Date: Wed, 29 Jul 92 12:33:51 -0400
From: Jeffrey I. Schiller <jis@mit.edu>
To: jis@mit.edu
Cc: srikar@Athena.MIT.EDU, network@Athena.MIT.EDU, op@Athena.MIT.EDU,
In-Reply-To: Jeffrey I. Schiller's message of Tue, 28 Jul 92 18:11:41 -0400 <9207282211.AA07711@big-screw>
Here is the latest word on the electrical shutdown for this weekend.
This information supersedes the information in my previous note.
NOTE: Some buildings may be shutdown on both Saturday and Sunday *AND*
buildings 5 & 7 WILL shutdown.
Starting at 7AM on Saturday morning Plant will shutdown power in the
following buildings:
1,2,3,4,5,6,7,8 and 12. Building 10 and 11 will *not* lose power.
Some buildings will be finished on Saturday. In particular the electrical
shop believes they will finish with buildings 5,7 and 12 on Saturday.
Starting around 5pm, all power will be restored.
On Sunday morning, again at 7AM power will be shutdown to those buildings
for which the work on Saturday did not complete. Plant has scheduled the
shutdown to run until 5pm, but expects that they will be finished and have
power back on by Noon.
Neil Tomlinson from the electrical shop will call me on Friday with any
last minute details. He will also leave me voicemail on Saturday evening
(which I will turn into an email message to this group) explaining exactly
which work was not completed and which buildings will need to be shutdown
on Sunday.
-Jeff