[9829] in Hotline Meeting
Shutdowns
daemon@ATHENA.MIT.EDU (Warren K Sze)
Thu Jul 23 14:21:10 1992
To: network@Athena.MIT.EDU
Cc: ops@Athena.MIT.EDU, hotline@Athena.MIT.EDU, burke@Athena.MIT.EDU
Date: Thu, 23 Jul 92 14:20:36 EDT
From: Warren K Sze <zdog@Athena.MIT.EDU>
Mary Files from Operations called to report 4 shutdowns.
In E18 on Mon 7/27. Starting Sunday 23:00 - Monday 1:00.
Fan exhuast shutdown. Affects quarter? kitchen mixer room 62.
In NW13 on Tues 7/28. Start 7AM. For 4 hours. Chilled water shutdown affecting
the entire building.
On Tues 7/28 from midnight to 6 AM. Fan exhaust hoods. 1 to 2 hours each. Three
of them in Building 13. Affecting rooms 13-3031, 13-3036, 13-3015.
On Tues 7/28 for 8 hours. Hot water shutdown starting 7:30 AM. Will affect
buildings 3,4, 10, 11. No hot water. Also affect 3rd and 4th floor water
fountains and the 390 kitchen area.
---------------------
Warren
Network Help Desk