Hi all,
At approx. 10:30 p.m. I was contacted by the Physical Plant Operations
Center, regarding a communication failure with the Operations Center monitoring
equipment for the bldg 1. area. The failing equipment monitors the chilled
water throughout bldg 1. Plant will be providing(in person) checks twice per
shift until the problem is rectified. The Operations Center will contact 1410
when the problem is resolved.
This is the same problem, which happened on 4/16.
I will try and get a work order tonight on this problem for easier tracking.
The 1-115, 1-115A, and 1-142 areas will be receiving the in person visits.
--Lou