[8774] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg 1. Area

daemon@ATHENA.MIT.EDU (larugsi@Athena.MIT.EDU)
Thu Apr 23 22:56:41 1992

From: larugsi@Athena.MIT.EDU
To: burke@Athena.MIT.EDU, hotline@Athena.MIT.EDU
Cc: cec@Athena.MIT.EDU, jis@Athena.MIT.EDU, joanne@Athena.MIT.EDU,
Date: Thu, 23 Apr 92 22:56:16 EDT

Hi all,
      At approx. 10:30 p.m. I was contacted by the Physical Plant Operations
Center, regarding a communication failure with the Operations Center monitoring
equipment for the bldg 1. area. The failing equipment monitors the chilled
water throughout bldg 1. Plant will be providing(in person) checks twice per
shift until the problem is rectified. The Operations Center will contact 1410
when the problem is resolved. 
This is the same problem, which happened on 4/16.
I will try and get a work order tonight on this problem for easier tracking.
The 1-115, 1-115A, and 1-142 areas will be receiving the in person visits.
                                       --Lou           

home help back first fref pref prev next nref lref last post