[70751] in Hotline Meeting
Bldg. 13 - Hot/Cold Domestic and Lab Process Water Shutdown Reque
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Dec 19 15:03:56 2003
Message-ID: <568F0AEE7A57D511923900508B55645103D71ECD@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
"'elk@mit.edu'" <elk@MIT.Edu>, "'generoso@mit.edu'" <generoso@MIT.Edu>,
"'schedule@mit.edu'" <schedule@MIT.Edu>, "'src@mit.edu'" <src@MIT.Edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 19 Dec 2003 15:03:48 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C3C66B.3751E4A0"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C3C66B.3751E4A0
Content-Type: text/plain
> To: B-Zone; Cust-Coach; elk@mit.edu; generoso@mit.edu; schedule@mit.edu;
> src@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 13 - Hot/Cold Domestic and Lab Process Water Shutdown
> Request
>
>
The following hot/cold domestic and lab process water shutdown request for
Bldg. 13 on Tuesday, 12/30 and Wednesday, 12/31/03 is for your information
and comment. Would you please let me know whether this does or does notmeet
with your approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 13
> Date: 12/30/2003
> Day: Tuesday
> Time: 6 AM - 12 noon each day
> System: Hot/Cold Domestic and Lab Process Water
> Duration: 2 days at 6 hours each day
> Reason:
> Installing new acid waste tanks.
>
> Effect:
> Loss of hot/cold domestic water in Bldg. 13. This means that no toilets,
> bathroom, kitchen sink faucets or drinking fountains will be operational
> during the shutdown period. Loss of hot/cold lab process water. This
> means that no sink faucets in the labs, emergency showers or eyewash
> stations will be operational during the shutdown period.
>
>
------_=_NextPart_001_01C3C66B.3751E4A0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 13 - Hot/Cold Domestic and Lab Process Water Shutdown =
Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">B-Zone; Cust-Coach; elk@mit.edu; =
generoso@mit.edu; schedule@mit.edu; src@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 13 - Hot/Cold =
Domestic and Lab Process Water Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following hot/cold =
domestic and lab process water shutdown request for Bldg. 13 on =
Tuesday, 12/30 and Wednesday, 12/31/03 is for your information and =
comment. Would you please let me know whether this does or does =
notmeet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">13</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">12/30/2003</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Tuesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">6 AM - 12 noon each day</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Hot/Cold Domestic and Lab Process =
Water</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">2 days at 6 hours each day</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Installing new acid waste =
tanks.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of hot/cold domestic =
water in Bldg. 13. This means that no toilets, bathroom, kitchen sink =
faucets or drinking fountains will be operational during the shutdown =
period. Loss of hot/cold lab process water. This means that no =
sink faucets in the labs, emergency showers or eyewash stations will be =
operational during the shutdown period. </FONT> </P>