Bldg. 48 - Building Power Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Oct 31 07:33:36 2003

Message-ID: <568F0AEE7A57D511923900508B55645103D71BFB@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
        "'mistetri@mit.edu'" <mistetri@MIT.Edu>,
        "'schedule@mit.edu'"
	 <schedule@MIT.Edu>,
        "'sfrankel@mit.edu'" <sfrankel@MIT.Edu>,
        "'jengle@mit.edu'" <jengle@MIT.Edu>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 31 Oct 2003 07:32:55 -0500

> To: 	B-Zone; Cust-Coach; mistetri@mit.edu; schedule@mit.edu;
> sfrankel@mit.edu; jengle@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 48 - Building Power Shutdown Request
> 
> 
The following building power shutdown request for Bldg. 48 on Saturday,
November 8 is for your information and comment.  Would you please let me
know whether this does or does not meet with your approval.

Thanks very much.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 48
> Date: 11/8/2003
> Day: Saturday
> Time: 6 AM - 6 PM
> System: Building Power - All Mechanical Systems
> Duration: 12 hours
> Reason: 
> Tie-in new switchgear.
> 
> Effect: 
> Loss of building power in Bldg. 48.  This means that no elvators, emegency
> power (back-up power), computers, lighting in all of 48 including in
> corridors and stairs, Air: supply ventilation (air from outside), supply
> cooling, supply heating, exhaust-laboratory, exhaust-general,
> exhaust-toilet, compressed control air; Steam: condensate return will be
> operational during the 12-hour shutdown period.
> 
> 