Bldg. 6 and 6A - Heating Hot Water/Supply Heating (Low Pressure S

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Oct 23 11:38:37 2003

Message-ID: <568F0AEE7A57D511923900508B55645103D71B8D@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: C-Zone <C-Zone@MIT.EDU>, "'chemistryhq@mit.edu'" <chemistryhq@MIT.EDU>,
        Cust-Coach <cust-coach@MIT.EDU>, "'ghughes@mit.edu'" <ghughes@MIT.EDU>,
        "'glabonte@mit.edu'" <glabonte@MIT.EDU>,
        "'khewitt@mit.edu'"
	 <khewitt@MIT.EDU>,
        "'mhankin@mit.edu'" <mhankin@MIT.EDU>,
        "'rhasselt@MIT.EDU'" <rhasselt@MIT.EDU>,
        "'rrdasari@mit.edu'"
	 <rrdasari@MIT.EDU>,
        "'saraf@mit.edu'" <saraf@MIT.EDU>,
        "'schedule@mit.edu'" <schedule@MIT.EDU>,
        "'serotek@mit.edu'"
	 <serotek@MIT.EDU>,
        "'swade@mit.edu'" <swade@MIT.EDU>,
        "'heatherg@mit.edu'" <heatherg@MIT.EDU>,
        "'vrusso@mit.edu'"
	 <vrusso@MIT.EDU>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Thu, 23 Oct 2003 11:36:52 -0400

> To: 	C-Zone; chemistryhq@mit.edu; Cust-Coach; ghughes@mit.edu;
> glabonte@mit.edu; khewitt@mit.edu; mhankin@mit.edu; rhasselt@MIT.EDU;
> rrdasari@mit.edu; saraf@mit.edu; schedule@mit.edu; serotek@mit.edu;
> swade@mit.edu; heatherg@mit.edu; vrusso@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 6 and 6A - Heating Hot Water/Supply Heating (Low
> Pressure Steam) Shutdown Requst
> 
> 
The following heating hot water/supply heating (low pressure steam) shutdown
request for Bldg. 6 - 3rd and 4th floors; Lazer Labs - Heating, 007, 009,
0011, 0013, 0015 and Bldg. 6A - 100, 130 and 160 on Thursday, October 30 is
for your information and comment.  Would you please let me know whether this
does or does not meet with your approval.

Thanks very much.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 6 - 3rd and 4th floors; Laser Labs' (Heating); 007, 009, 0011,
> 0013 and 0015
> Date: 10/30/2003
> Day: Thursday
> Time: 9 AM - 5 PM
> System: Low Pressure Steam/Heating Hot Water/Supply Heating
> Duration: 8 hours
> Reason: 
> Replace steam valve for CV1
> 
> Effect: 
> Loss of heating hot water (building heat) to the above-mentioned areas as
> well as. loss of supply heating via ceiling supply fans during the 8-hour
> shutdown periods.
> 
> 