[69188] in Hotline Meeting

home help back first fref pref prev next nref lref last post

FW: Case 450537: Bldg. 66 - Chilled Water/Compressed Control Air

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Oct 23 09:49:05 2003

Message-ID: <568F0AEE7A57D511923900508B55645103D71B86@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>
Date: Thu, 23 Oct 2003 09:46:32 -0400

This message is for +John.
Please note Raul Varela's comments below. This shutdown will not take place
on Fri., 10/24. I am waiting to hear of a new date. I will forward that
information onto you when I receive it.

Also please note Raul will handle your request for extra cooling in 66 - 080
when the shutdown takes place.
FYI.
  Andrea
-------------------------------
From: Raul Varela 
Sent: Tuesday, October 21, 2003 3:14 PM
To: Andrea Nichols
Cc: swetzel@mit.edu; Gerry Desmond; Warren Scott
Subject: RE: Case 450537: Bldg. 66 - Chilled Water/Compressed Control
Air Shutdown Request


Andrea,

I'm re-scheduling the shutdown do to a lecture that will take place on
Friday next week. I'll get back to you with the alternate date. I'll like to
use the existing shutdown form that you have, so please don't dispose of it.

I'll address John's request.

Raul



Warren, Gerry,

Do we have a spot cooler to install in 66-080 while we do this shutdown?

Raul




-----Original Message-----
From: Andrea Nichols 
Sent: Tuesday, October 21, 2003 3:07 PM
To: Raul Varela
Subject: FW: Case 450537: Bldg. 66 - Chilled Water/Compressed Control Air
Shutdown Request

Raul --

Since this is your shutdown request - would you please make arrangements for
+John's request for 66 - 080? Thanks.
 Andrea

-----Original Message-----
From: Andrea Nichols 
Sent: Tuesday, October 21, 2003 1:24 PM
To: Gerry Desmond; David Foster
Cc: Warren Scott
Subject: FW: Case 450537: Bldg. 66 - Chilled Water/Compressed Control
Air Shutdown Request
Importance: High


Hi guys --
Please read  +John's request below re cooling fans in 66 - 080 Computer
Cluster. Is this possible? Pls. respond and thanks.
  Andrea

-----Original Message-----
From: hotline@MIT.EDU [mailto:hotline@MIT.EDU]
Sent: Tuesday, October 21, 2003 1:14 PM
To: ANDREA@PLANT.MIT.EDU
Cc: larugsi@MIT.EDU; bmurphy@MIT.EDU
Subject: Case 450537: Bldg. 66 - Chilled Water/Compressed Control Air
Shutdown Request


For the duration of the 8 hour shutdown we will need cooling fans installed
in the 66-080 computer cluster. If any question, Please contact John Guy or
Lou Isgur(Athena) at 3-0815 leave message we will get back to you promptly.
Thanks
+JOHN

[10/21/2003 13:13:51 jtguy Comment]

===========================================================
Please retain the case reference in the subject line for future replies
associated with this case

Case History
==================

10/21/2003 11:49:34 daemon Email Received

Date: Tue, 21 Oct 2003 11:48:22 -0400
To: A-Zone <A-Zone@mit.edu>, Cust-Coach <cust-coach@mit.edu>,
"'haverty@mit.edu'" <haverty@mit.edu>, "'kkgleasn@mit.edu'"
<kkgleasn@mit.edu>, "'schedule@mit.edu'" <schedule@mit.edu>,
"'swetzel@mit.edu'" <swetzel@mit.edu>, "'shutdowns@mit.edu'"
<shutdowns@mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Subject: Bldg. 66 - Chilled Water/Compressed Control Air Shutdown Request


> To: 	A-Zone; Cust-Coach; haverty@mit.edu; kkgleasn@mit.edu;
> schedule@mit.edu; swetzel@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 66 - Chilled Water/Compressed Control Air Shutdown
> Request
> 
> 
The following chilled water/compressed control air shutdown request for
Bldg. 66 - Perimeter Area Entire building on Friday, October 24, is for your
information and comment.  Would you please let  me know whether this does or
does not meet with your approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 66 - perimeter area - entire building
> Date: 10/24/2003
> Day: Friday
> Time: 7 AM - 3 PM
> System: Chilled Water (including air conditioning and lab chilled
> water)/Compressed Control Air
> Duration: 8 hours
> Reason: 
> Replace existing 5" butterfly valve and install new control valve.
> 
> Effect: 
> Loss of chilled water to Air Handler 1 Coils (affects air conditioningand
> lab chilled water) and compressed control air in Bldg. 66 - perimeter
> areas during the 8-hour shutdown period.
> 
> 


10/21/2003 13:13:51 jtguy Comment

For the duration of the 8 hour shutdown we will need cooling fans installed
in the 66-080 computer cluster. If any question, Please contact John Guy or
Lou Isgur(Athena) at 3-0815 leave message we will get back to you promptly.
Thanks
+JOHN


home help back first fref pref prev next nref lref last post