[68821] in Hotline Meeting
RE: Bldg 18 shutdown request for 10/15/03 - more info
daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Wed Oct 8 14:15:34 2003
Message-ID: <568F0AEE7A57D511923900508B55645136682F@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.EDU>, "'chemistryhq@mit.edu'" <chemistryhq@MIT.EDU>,
Cust-Coach <cust-coach@MIT.EDU>, "'lhowe@mit.edu'" <lhowe@MIT.EDU>,
"'serotek@mit.edu'" <serotek@MIT.EDU>,
"'swade@mit.edu'" <swade@MIT.EDU>,
"'schedule@mit.edu'" <schedule@MIT.EDU>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 8 Oct 2003 14:12:12 -0400
A control air shutdown will shutdown all the supply fans and exhaust fans in
the building.
Thank you
Dawn Simonelli
Repair and Maintenance
> Status: Normal
> Building: 18
> Date: 10/15/2003
> Day: Wednesday
> Time: 4 am - 5 am
> System: Control air
> Duration: 1 hour
> Reason:
> Relocate the control air main outside of high voltage room in sub
> basement.
>
> Effect:
> There will be a loss of compressed controlled air. (No tempature control
> during this shutdown)
>
>