[68351] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldgs. W71, W84 and W85 Emergency All Steam/Condensate Return Shu

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Sep 18 09:59:07 2003

Message-ID: <568F0AEE7A57D511923900508B55645103D719B1@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: RM-PipeSys <rm-pipesys@mit.edu>, "'kcn@mit.edu'" <kcn@mit.edu>,
        "'mwhelan@mit.edu'" <mwhelan@mit.edu>,
        "'rberlin@mit.edu'"
	 <rberlin@mit.edu>,
        "'wganger@mit.edu'" <wganger@mit.edu>,
        "'mlieberm@mit.edu'" <mlieberm@mit.edu>,
        "'bailey@mit.edu'"
	 <bailey@mit.edu>,
        "'general@mit.edu'" <general@mit.edu>,
        "'bunky@mit.edu'" <bunky@mit.edu>, "'dcosta@mit.edu'" <dcosta@mit.edu>,
        "'johnnyd@mit.edu'" <johnnyd@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
        Operators
	 <Operators@PLANT.MIT.EDU>,
        Michael Correira <mmcorrei@PLANT.MIT.EDU>,
        George Herald <gherald@PLANT.MIT.EDU>, D-Zone <D-Zone@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>
Date: Thu, 18 Sep 2003 09:58:48 -0400

> To: 	RM-PipeSys; kcn@mit.edu; mwhelan@mit.edu; rberlin@mit.edu;
> wganger@mit.edu; mlieberm@mit.edu; bailey@mit.edu; general@mit.edu;
> bunky@mit.edu; dcosta@mit.edu; johnnyd@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators; Michael
> Correira; George Herald; D-Zone; shutdowns@mit.edu
> Subject: 	Bldgs. W71, W84 and W85 Emergency All Steam/Condensate
> Return Shutdown
> 
> 
The following emergency All Steam/Condensate Return shutdown for Bldgs. W71,
W84 and W85 for today, Thursday, 9/18 at 10 AM is for your information.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Emergency
> Building: W71, W84 and W85
> Date: 9/18/2003
> Day: Thursday
> Time: 10 AM - 2 PM
> System: All Steam/Condensate Return
> Duration: 4 hours
> Reason: 
> To repair cracked weld in Manhole !1022.
> 
> Effect: 
> Loss of all steam/condensate return in the above-listed buildings. This
> means there will be no hot domestic water for showers, bathroom, kitchen
> sink faucets, cold domestic water for  toilets, bathroom, kitchen sink
> faucets or drinking fountains as well as building heating hot water (steam
> heat) or supply heating via ceiling supply fans during the emergency
> shutdown period.
> 
> 

home help back first fref pref prev next nref lref last post