[66985] in Hotline Meeting
Bldg. 31 Asbestos Removal Notification
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jul 18 08:54:44 2003
Message-ID: <568F0AEE7A57D511923900508B556451023F22D7@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: RM-Plumbing <rm-plumbing@mit.edu>, B-Zone <B-Zone@mit.edu>,
Cust-Coach
<cust-coach@mit.edu>,
"'gallant@mit.edu'" <gallant@mit.edu>,
"'jmletend@mit.edu'" <jmletend@mit.edu>,
"'rcf@space.mit.edu'"
<rcf@space.mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'thane@mit.edu'" <thane@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'tr6@mit.edu'" <tr6@mit.edu>,
"'jdoucett@mit.edu'"
<jdoucett@mit.edu>,
"'dcosta@mit.edu'" <dcosta@mit.edu>,
Walter Latta
<walatta@PLANT.MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
Operators
<Operators@PLANT.MIT.EDU>
Date: Fri, 18 Jul 2003 08:54:38 -0400
> To: RM-Plumbing; B-Zone; Cust-Coach; gallant@mit.edu; jmletend@mit.edu;
> rcf@space.mit.edu; schedule@mit.edu; thane@mit.edu; shutdowns@mit.edu;
> tr6@mit.edu; jdoucett@mit.edu; dcosta@mit.edu; Walter Latta
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators
> Subject: Bldg. 31 Asbestos Removal Notification
>
>
The following asbestos removal notification for Bldg. 31 - 035A on Monday,
July 21 through Tuesday, July 22 is for your information. If you have any
questions about this, please feel free to contact me either by return e-mail
or telephone.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 31 - 035A
> Date: 7/21/2003
> Day: Monday
> Time: 7 AM (7/21) - 4 PM (7/22)
> System: None - asbestos removal notification only
> Duration: 33 hours
> Reason:
> Must remove 12 inches of insulation on pipe and replace valve.
>
> Effect:
> No access to 31-035A during the asbestos removal period.
>
>