[66534] in Hotline Meeting
Bldg. 18 and 6 Extended Hot/Cold Domestic/Lab Process Water and L
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jun 20 10:25:05 2003
Message-ID: <568F0AEE7A57D511923900508B556451023F211D@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.Edu>, "'chemistryhq@mit.edu'" <chemistryhq@MIT.Edu>,
Cust-Coach <cust-coach@MIT.Edu>, "'lhowe@mit.edu'" <lhowe@MIT.Edu>,
"'rjwilk@mit.edu'" <rjwilk@MIT.Edu>,
"'serotek@mit.edu'"
<serotek@MIT.Edu>,
"'swade@mit.edu'" <swade@MIT.Edu>,
"'ghughes@mit.edu'" <ghughes@MIT.Edu>,
"'glabonte@mit.edu'"
<glabonte@MIT.Edu>,
"'khewitt@mit.edu'" <khewitt@MIT.Edu>,
"'mhankin@mit.edu'" <mhankin@MIT.Edu>,
"'rhasselt@MIT.EDU'"
<rhasselt@MIT.Edu>,
"'rrdasari@mit.edu'" <rrdasari@MIT.Edu>,
"'saraf@mit.edu'" <saraf@MIT.Edu>,
"'hetherg@mit.edu'" <hetherg@MIT.Edu>,
"'vrusso@mit.edu'" <vrusso@MIT.Edu>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.Edu>, C-Zone <C-Zone@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 20 Jun 2003 10:25:01 -0400
> To: A-Zone; chemistryhq@mit.edu; Cust-Coach; lhowe@mit.edu;
> rjwilk@mit.edu; serotek@mit.edu; swade@mit.edu; ghughes@mit.edu;
> glabonte@mit.edu; khewitt@mit.edu; mhankin@mit.edu; rhasselt@MIT.EDU;
> rrdasari@mit.edu; saraf@mit.edu; hetherg@mit.edu; vrusso@mit.edu;
> shutdowns@mit.edu; C-Zone
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 18 and 6 Extended Hot/Cold Domestic/Lab Process Water
> and Lab Waste Shutdown Request
>
>
Dear Everyone
The following extended hot/cold domestic and lab process water and lab waste
shutdown request for Bldgs. 18 - Phase I Labs and all of Building 6
initially on Wednesday, June 18 and now on Tuesday, June 24 is again for
your information and comment. Would you please let me know whether this
does or does not meet with your approval.
Thanks very much for your time and I look forward to hearing from you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 18 - Phase I Labs and Building 6 - All
> Date: 6/24/2003
> Day: Tuesday
> Time: 6 AM - 10 AM
> System: Acid Waste, Hot/Cold Domestic Water/Hot/Cold Lab Process Water
> Duration: 4 hours
> Reason:
> Tie-in building 18 acid waste drains to new sump in subbasement.
>
> Effect:
> Loss of hot/cold domstic water in Bldg. 18 - Phase 1 Labs and all of Bldg.
> 6. This means that no toilets, emergency showers, bathroom, kitchen, lab
> sink faucets or drinking fountains will be operational during the shutdown
> period. Loss of hot/cold lab process water in the above-listed areas.
> This means that no lab equipment or lab sinks requiring same will be
> operational during the shutdown period. Loss of lab waste drainage in the
> above-listed areas during the shutdown period.
>
>