Hi all,
      I have just got off the phone with Jack Narcotta (Physical Plant).
An outside contractor has been hired to completely re-insulate all the sweating
pipes in 4-035. The work should begin in about a week to a week and a half,
and should take about 3/4's of day to complete. Jack has promised that 1410
will be notified when the contractor is ready. If the cluster should be open
by then, it still would not pose a major problem. All the work is at the back
of the room.
                                                --Lou
------- Forwarded Message

Received: by E40-PO.MIT.EDU (5.45/4.7) id AA06791; Tue, 1 Oct 91 07:30:07 EDT
Received: from HECTOR.MIT.EDU by Athena.MIT.EDU with SMTP
	id AA27973; Tue, 1 Oct 91 07:30:04 EDT
From: jjmorey@Athena.MIT.EDU
Received: by hector.MIT.EDU (5.61/4.7) id AA07326; Tue, 1 Oct 91 07:30:01 -0400
Date: Tue, 1 Oct 91 07:30:01 -0400
Message-Id: <9110011130.AA07326@hector.MIT.EDU>
To: support@Athena.MIT.EDU

/***** hector:hotline / priam!jjmorey /  7:15 am  Sep 26, 1991*/
From larugsi@ATHENA.MIT.EDU  Thu Aug 22 21:28:44 1991
From: larugsi@ATHENA.MIT.EDU
To: hotline@ATHENA.MIT.EDU
Cc: support@ATHENA.MIT.EDU
Subject: M4-035 A/C Leak:
Date: Thu, 22 Aug 91 21:27:16 EDT


I don't have time to deal with this problem, if someone else or others in
support could work on it that would be great.

- --jjmorey

PS.  Just because my name is on it, it wont hurt my feelings if someone else
     jumps on this.  

THANKS

Young had contacted Connie regarding a leak from the overhead A/C Unit.
Connie had called Physical Plant. I have been in touch with Plant this evening
who stated that a work order has gone in to the plumbing dept. The piping
needs to be insulated. I requested (under the circumstances) that 1410 be
notified before entering the facility.
                                     --Lou



I have called plant this morning to see what is being done and make sure the
ball was not dropped.  A work order was put in for the plumbers (controllers and
fitters) last Fri.  The person I spoke to said he will give them a reminder.
I also stressed the importance of this being done ASAP.

- --jjmorey

 
   I have called Physical Plant to get some status of this problem since
  systems will be installed in this room soon. I was given two contact
  names:  Jack Mannion, 253-6396 and Jack Narcotta, 253-6352.
   I have left a message for Jack Narcotta to call back and let us know
  what's happening.  The Work Order is still open...  -Rita 2:20pm, 9/11


   Jack Narcotta has returned the call.  He had checked out the problem
  on Thurs. 9/12, and he found no problems with both of the A/C units.
  He reported that both A/C units had drained okay, but he was going
  to check them again. -Rita 9:05am, 9/13


The work order is still unsafisfied.  I have called Jack Narcotta and left
a message that he return my call.  9-25-91 2:35pm

- --jjmorey

Jack N. has left voice mail on 1410 at 4:15pm.  He may work the second shift.
I will call and find out.  9-26-91 7:15.

- --jjmorey
/* ---------- */

------- End of Forwarded Message