[61414] in Hotline Meeting
Bldg. E60 - Emergency Chilled Water/Suply Cooling/Air Handler 1 S
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Sep 19 14:52:00 2002
Message-ID: <568F0AEE7A57D511923900508B55645101232694@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'gwj@mit.edu'" <gwj@mit.edu>, "'kima2@mit.edu'" <kima2@mit.edu>,
"'lhill@mit.edu'" <lhill@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'johnnyd@mit.edu'" <johnnyd@mit.edu>,
"'dcosta@mit.edu'" <dcosta@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
Operators
<Operators@PLANT.MIT.EDU>,
Tom Delena <tdelena@PLANT.MIT.EDU>, E-Zone
<E-Zone@mit.edu>
Date: Thu, 19 Sep 2002 14:51:57 -0400
MIME-Version: 1.0
Content-Type: text/plain
> To: gwj@mit.edu; kima2@mit.edu; lhill@mit.edu; shutdowns@mit.edu;
> johnnyd@mit.edu; dcosta@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators; Tom Delena;
> E-Zone
> Subject: Bldg. E60 - Emergency Chilled Water/Suply Cooling/Air
> Handler 1 Shutdown
>
>
Dear Everyone:
I have been informed the compressor has not yet been repaired in E60
(original emergency notification sent on Monday, 9/16 at 12:04 PM). This
will be worked on throughout the weekend and will be operational on Monday,
9/23. This is for your information.
Thank you for your patience in this matter.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Emergency
> Building: E60 - 2nd and 3rd floors
> Date: 9/16/2002
> Day: Monday
> Time: 11:10 AM (9/16) - 3 PM (9/22)
> System: Chilled Water/Supply Cooling/Air Handler 1
> Duration: 7 days
> Reason:
> Compressor broke down.
>
> Effect:
> Loss of chilled water (air conditioning) on 2nd floor and Air Handler
> 1/supply cooling on 3rd floor during the shutdown period.
>
>