[61346] in Hotline Meeting
Blg. E60 - Emergency Chilled Water/Supply Cooling/Air Handler 1 S
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Sep 16 12:04:59 2002
Message-ID: <568F0AEE7A57D511923900508B55645101232644@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'gwj@mit.edu'" <gwj@mit.edu>, "'kima2@mit.edu'" <kima2@mit.edu>,
"'lhill@mit.edu'" <lhill@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'johnnyd@mit.edu'" <johnnyd@mit.edu>,
"'dcosta@mit.edu'" <dcosta@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
Tom Delena
<tdelena@PLANT.MIT.EDU>,
Operators <Operators@PLANT.MIT.EDU>
Date: Mon, 16 Sep 2002 12:04:56 -0400
MIME-Version: 1.0
Content-Type: text/plain
> To: gwj@mit.edu; kima2@mit.edu; lhill@mit.edu; shutdowns@mit.edu;
> johnnyd@mit.edu; dcosta@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Tom Delena; Operators
> Subject: Blg. E60 - Emergency Chilled Water/Supply Cooling/Air
> Handler 1 Shutdown
>
>
The following emergency chilled water/supply cooling/Air Handler 1 shutdown
for Bldg. E60 - 2nd and 3rd floors on Monday, 9/16 is for your information.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Emergency
> Building: E60
> Date: 9/16/2002
> Day: Monday
> Time: 11:10 AM - unknoan
> System: Chilled Water/Supply Cooling/Air Handler 1
> Duration: unknown
> Reason:
> Compressor broke down.
>
> Effect:
> Loss of chilled water (air conditioning) on 2nd floor and Air Handler
> 1/supply cooling on 3rd floor during the shutdown period.
>
>