[61277] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. NW14 - Emergency Chilled Water/Heating Hot Water/Supply Coo

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Sep 11 13:54:36 2002

Message-ID: <568F0AEE7A57D511923900508B55645101232601@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'cahavers@MIT.EDU'" <cahavers@MIT.EDU>, D-Zone <D-Zone@MIT.EDU>,
        "'devries@mit.edu'" <devries@MIT.EDU>,
        "'fulton@psfc.mit.edu'"
	 <fulton@psfc.mit.edu>,
        "'galanek@mit.edu'" <galanek@MIT.EDU>,
        "'hrycaj@psfc.mit.edu'" <hrycaj@psfc.mit.edu>,
        "'jcyanch@mit.edu'"
	 <jcyanch@MIT.EDU>,
        "'mlej@mit.edu'" <mlej@MIT.EDU>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
        Tony Small
	 <alto@PLANT.MIT.EDU>, "'dcosta@mit.edu'" <dcosta@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@MIT.EDU>,
        Operators
	 <Operators@PLANT.MIT.EDU>
Date: Wed, 11 Sep 2002 13:54:27 -0400
MIME-Version: 1.0
Content-Type: text/plain

> To: 	cahavers@MIT.EDU; D-Zone; devries@mit.edu; fulton@psfc.mit.edu;
> galanek@mit.edu; hrycaj@psfc.mit.edu; jcyanch@mit.edu; mlej@mit.edu;
> shutdowns@mit.edu; Tony Small; dcosta@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators
> Subject: 	Bldg. NW14 - Emergency Chilled Water/Heating Hot
> Water/Supply Cooling Shutdown
> 
> 
The following emergency chilled water/heating hot water/supply cooling
shutdown for Bldg. NW14 on Thursday, 9/12 is for your information.  

Thank you.

Andrea Nichols
Repair and Maitnenance
8-7872

> Status: Emergency
> Building: NW14
> Date: 9/12/2002
> Day: Thursday
> Time: 7 AM - 3 PM
> System: Heating Hot Water/Chilled Water/Supply Cooling
> Duration: 8 hours
> Reason: 
> Potted nipple on heating hot water line outside Rm. 4118 about to break.
> Also need to replace heating hot water and chilled water valves on Rm.
> 4117 Fan Coil unit.
> 
> Effect: 
> Loss of chilled water (air conditioning), heating hot water (building
> heat) and supply cooling via ceiling supply fans during the shutdown
> period.
> 
> 

home help back first fref pref prev next nref lref last post